Therefore, it is essential that high speed tripping is provided. This tripping should be almost
instantaneous (< 100 ms).
There is a risk that the current into the generator at inadvertent energization will be limited so
that the "normal" overcurrent or underimpedance protection will not detect the dangerous
situation. The delay of these protection functions might be too long. The reverse power protection
might detect the situation but the operation time of this protection is normally too long.
For big and important machines, fast protection against inadvertent energizing should, therefore,
be included in the protective scheme.
The protection against inadvertent energization can be made by a combination of undervoltage,
overvoltage and overcurrent protection functions. The undervoltage function will, with a delay for
example 10 s, detect the situation when the generator is not connected to the grid (standstill) and
activate the overcurrent function. The overvoltage function will detect the situation when the
generator is taken into operation and will disable the overcurrent function. The overcurrent
function will have a pick-up value about 50% of the rated current of the generator. The trip delay
will be about 50 ms.
11.1.3
Setting guidelines
The parameters for the general current and voltage protection function (CVGAPC) are set via the
local HMI or Protection and Control Manager (PCM600).
Common base IED values for the primary current (
power (
SBase ) are set in global base values for settings function GBASVAL.
GlobalBaseSel : Selects the global base value group used by the function to define IBase , VBase and
SBase . Note that this function will only use IBase value.
11.1.3.1
Directional negative sequence overcurrent protection
Directional negative sequence overcurrent protection is typically used as sensitive ground-fault
protection of power lines where incorrect zero sequence polarization may result from mutual
induction between two or more parallel lines. Additionally, it can be used in applications on
184
When inverse time overcurrent characteristic is selected, the trip time of the stage
will be the sum of the inverse time delay and the set definite time delay. Thus, if
only the inverse time delay is required, it is important to set the definite time delay
for that stage to zero.
The overcurrent steps has a
minimumpickup current. Set
ANSI reset characteristic according to standard. If
PickupCurr_OCx for any step the ANSI reset works as if current is zero when current
IMinx .
drops below
The function has default setting of operate values and timers according to the
typical application as a power system back up protection. These settings should be
modified according to the system back up protection strategy of individual utility.
The recommended minimum time delay setting of function should be greater than
0.05 s when used in process bus 9-2 application.
© Copyright 2017 Hitachi Power Grids. All rights reserved
IBase ), primary voltage ( VBase ) and primary
IMinx ( x =1 or 2 depending on step) setting to set the
IMinx below PickupCurr_OCx for every step to achieve
IMinx is set above
1MRK 511 407-UUS Rev. J
IP15009-1 v2
GUID-F7AA2194-4D1C-4475-8853-C7D064912614 v4
M13088-237 v5
M13088-3 v5
Phasor measurement unit RES670
Application manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion res670 a20Relion res670 b20

Table of Contents