TripDelay1(2) is set in seconds to give the time delay for trip of the stage after pick up.
Hysteresis1(2) is given in p.u. of generator rated power according to equation 69.
=
S
N
EQUATION2047 V1 EN-US
The drop out power will be
The possibility to have low pass filtering of the measured power can be made as shown in the
formula:
S TD S
=
EQUATION1893-ANSI V1 EN-US
Where
S
S
old
S
Calculated
TD
The value of
long.
The calibration factors for current and voltage measurement errors are set % of rated current/
voltage:
Phasor measurement unit RES670
Application manual
Q
Operate
Angle1(2) = 0
Power1(2)
For low forward power the set angle should be 0° in the underpower function
×
×
3 VBase IBase
Power1(2) + Hysteresis1(2) .
(
)
TD S
+
1
Old
Calculated
is a new measured value to be used for the protection function
is the measured value given from the function in previous execution cycle
is the new calculated value in the present execution cycle
is settable parameter
k = 0.92 is recommended in generator applications as the trip delay is normally quite
© Copyright 2017 Hitachi Power Grids. All rights reserved
°
P
en06000556.vsd
Section 8
Current protection
(Equation 69)
(Equation 70)