Page 3
Wide band scientific echo sounder Installation Manual This manual provides you with the basic information required to install the Simrad EK80 Wide band scientific echo sounder. The manual is intended for technical personnel; such as skilled shipyard workers, electricians, qualified engineers and naval architects.
Page 4
Kongsberg Maritime disclaims any responsibility for damage or injury caused by improper installation, use or maintenance of the equipment. Disclaimer Kongsberg Maritime AS endeavours to ensure that all information in this document is correct and fairly stated, but does not accept liability for any errors or omissions. Support information If you require maintenance or repair, contact your local dealer.
Installation Manual Table of contents ABOUT THIS MANUAL ............11 SIMRAD EK80 ................ 13 Important..........................14 System description ......................15 System diagram........................17 Main system units ......................19 Display description....................19 Processor Unit description..................20 Ethernet switch description ..................21 Transceiver Unit description ..................21 Transducer description ...................23 Simrad EC150-3C ....................23...
Page 6
Simrad EK80 Keep the transducer far away from the propellers ..........51 Mount the transducer at a safe distance from bow thruster(s) .......51 Summary and general recommendations ...............52 Acoustic noise........................54 Contributing factors....................54 Self noise ........................56 Ambient noise......................58 Fishing gear noise....................59 Electrical self noise ....................59 Some means to reduce acoustic noise ..............59...
Page 7
Installation Manual Splicing the transducer cable................107 Connections to specific hardware items................. 110 KVM (Keyboard Video Mouse) principle for a remote operating position ......................110 Processor Unit graphic adapter................112 Processor Unit serial adapter ................114 Serial line splitter Øverland UPC-3005..............118 Serial line splitter Øverland UPC–5000P.............122 Setting up the EK80 in a synchronized system..............126 About synchronization ..................126...
Page 8
Simrad EK80 Physical protection of cables ................168 Grounding of system cables .................169 Cable connections and terminations..............169 Cable identification....................170 Cable glands and termination procedures ............170 DIMENSIONAL SURVEYING ..........176 Quality assurance of EK80 data..................177 Surveying the transducer and the navigation sensors ............179 Dimensional survey accuracy requirements for ADCP operations .......181...
Page 9
Installation Manual Installing navigation sensors and other sensors ...........228 Defining the serial and Ethernet (LAN) port parameters ........230 Setting up the input from a navigation system (GPS) ..........231 Configuring the sensor interface................234 Setting up a serial or LAN (Ethernet) port for annotation input ......235 Connecting a catch monitoring system to a serial or LAN (Ethernet) port ...237 Connecting a trawl system to a serial or LAN (Ethernet) port......239 Setting up the input from a motion reference unit (MRU)........241...
Page 10
Simrad EK80 Supported datagram formats for speed log information........288 Supported datagram formats for temperature information........288 Supported datagram formats for water level offset information ......289 Supported formats for processed data to output ...........289 Supported formats for processed data to file ............290 Power requirements .......................292...
Page 11
Installation Manual Transporting Kongsberg Maritime equipment...............321 Lifting units and transportation boxes ................322 Inspection of units and transportation boxes after arrival..........323 Specifications for storage prior to installation or use.............324 Unpacking instructions ....................325 Unpacking standard parts and units..............326 Unpacking mechanical units ................327 Unpacking electronic and electromechanical units ..........328...
Note Kongsberg Maritime AS will accept no responsibility for any damage or injury to the system, vessel or personnel caused by equipment that has been incorrectly installed or maintained, or by drawings, instructions or procedures that have not been prepared by us.
Page 14
The source drawings (normally in AutoCad format) can be downloaded from our website. • https://www.kongsberg.com/ek80 Online information All end-user manuals provided for operation and installation of your Simrad EK80 can be downloaded from our website. • https://www.kongsberg.com/ek80 Our website also provides information about other Simrad products.
Simrad EK80 Installation Manual Important The EK80 is an advanced product. It is used with other advanced products. There is important information that you need to know. Note The EK80 software supports several different transceiver units. This publication is mainly intended for vessel installations of EK80 using the Wide Band Transceiver (WBT).
Support information, page 41 System description The Simrad EK80 is the most modern high-end split-beam scientific echo sounder in the scientific market. Based on more than 60 years of research and development in close collaboration with leading marine scientists this wideband echo sounder system has succeeded the famous EK60, which became an international standard for fish stock assessment.
Page 18
By means of a common and well documented RAW data format, EK80 data can be collected and integrated across a variety of acoustic platforms. The Simrad EK80 can operate a large number of frequencies simultaneously ranging from 10 to 500 kHz. A wide selection of high quality accurate transducers is available.
In this publication, the computer is referred to as the Processor Unit. Basic system The basic Simrad EK80 Wide band scientific echo sounderconsists of one transducer, one Wide Band Transceiver (WBT) and one Processor Unit. Additional transceivers and transducers can be added to meet your operational and functional requirements.
Page 20
Simrad EK80 Installation Manual The Simrad EC150-3C is a 150 kHz phased-array transducer designed for current profiling applications. It offers 2.8 degrees beamwidth for accurate current profiling and 2.5 degrees beamwidth when applied as a split-beam echo sounder transducer. The EC150-3C housing includes the required transceiver circuitry.
The chosen display must be designed for maritime use, and it must meet the minimum performance specifications. You must also make sure that the chosen display supports the video formats provided by the Processor Unit. Kongsberg Maritime may provide a suitable display.
EK80. The Processor Unit is designed for rugged maritime use. It has been customized by Kongsberg Maritime. Except from the fans, it contains no moving parts. The computer is based on a commercial design, but the software and hardware have been specified by Kongsberg Maritime to suit the EK80 requirements.
(WBT) to the Processor Unit. Related topics Main system units, page 19 Simrad EK80, page 13 Transceiver Unit description The EK80 Wide Band Transceiver (WBT) is provided to transmit acoustic energy through water. This transmission and reception are commonly referred to as a ping. After each transmission, the transceiver receives the echoes from the targets in the water and/or the seabed.
Page 24
Simrad EK80 Installation Manual Note If more than one Wide Band Transceiver (WBT) is used, a small high capacity Ethernet switch is required to connect the transceivers to the Processor Unit. WBT Mini The WBT Mini is a compact version of the highly efficient Wideband Transceiver (WBT) used by marine research vessels all around the world.
The EK80 Wide band scientific echo sounder can be used with all our single-beam and split-beam transducers. Kongsberg Maritime can provide a wide range of efficient and accurate Simrad transducers for the EK80 Wide band scientific echo sounder. A large number of operational frequencies is available.
Page 26
Simrad EK80 Installation Manual The transducer is normally mounted flush with the hull plating or the bottom of a blister. A clamping ring is used to secure the transducer body to a mounting ring. The mounting ring is welded into the hull plating.
Operational software Operational software is provided on a suitable media. If the Processor Unit is purchased from Kongsberg Maritime, the operational software is installed on the Processor Unit, and ready for use. End-user documentation End-user documentation is provided on paper and/or digital formats.
Page 28
Simrad EK80 Installation Manual Related topics Scope of supply, page 25 Simrad EK80, page 13 385609 Processor Unit dimensions, page 310 388697 Wide Band Transceiver (WBT) outline dimensions, page 308 394149/D...
These items must be added to the EK80 for full operational functionality. The additional items can be provided by Kongsberg Maritime. You can order them with the other basic EK80 items. You can also purchase these items from your dealer, agent or local supplier.
Page 30
The computer is not a standard part of the EK80 delivery. This is a commercial item that can be purchased locally. The Simrad EK80 system is designed to be controlled by a maritime computer. The computer must be designed for rugged use, and the construction must be able to withstand the vibrations and movements of a vessel.
Page 31
Related topics Additional required items, page 27 Scope of supply, page 25 Simrad EK80, page 13 Ethernet switch If you use more than one Wide Band Transceiver (WBT), a high capacity Ethernet switch is required. The Ethernet switch is used to connect each Wide Band Transceiver (WBT) to the Processor Unit.
Page 32
• KM Binary KM Binary is a proprietary datagram format created by Kongsberg Maritime for general use. This format has very high resolution on timing and sensor parameters. Note The EK80 only accepts one datagram format for motion data. If you choose to use this format, no other formats are accepted.
An order number is the unique identifier used when a unit or an item is ordered. The number identifies a complete unit and relevant accessories packed in its shipping container. Related topics Additional optional items, page 31 Scope of supply, page 25 Simrad EK80, page 13 400930 WBT Cabinet outline dimensions, page 314 394149/D...
Page 34
If the distance between the Processor Unit and your second display is considerable, we suggest that you use KVM (Keyboard Video Mouse) technology to preserve the video quality. Kongsberg Maritime may provide a suitable display. Consult your local dealer or agent for more information. Related topics...
Page 35
Related topics Additional optional items, page 31 Scope of supply, page 25 Simrad EK80, page 13 Course gyro When a course gyro is connected to the EK80, the vessel’s current heading can be presented in the user interface. A course gyro is not a part of the EK80 delivery.
Page 36
• EM Attitude 3000 The Kongsberg EM Attitude 3000 is a proprietary datagram format created by Kongsberg Maritime for use with digital motion sensors. It holds roll, pitch, heave and heading information. The datagram contains a 10-byte message. Note The EK80 only accepts one datagram format for motion data. If you choose to use this format, no other formats are accepted.
Page 37
Related topics Additional optional items, page 31 Scope of supply, page 25 Simrad EK80, page 13 Uninterruptible power supply (UPS) It is important to ensure continuous operation of the EK80 independent of varying quality of the vessel's mains supply. The use of an uninterruptible power supply is therefore recommended.
Simrad EK80 Installation Manual General safety rules The following safety precautions must be followed at all times during installation and maintenance work: WARNING This equipment operates on 230 VAC at 50/60 Hz. This voltage is lethal! You must never work alone on high-voltage equipment! •...
-15% to +20% of the nominal voltage (except under fault conditions). Related topics Installation requirements, page 37 Simrad EK80, page 13 Uninterruptible power supply (UPS) requirements We recommend that the EK80 system is powered using an Uninterruptible Power Supply (UPS) with sine wave output.
Simrad EK80 Installation Manual Cables and wiring requirements Correct wiring is crucial for the operational performance of the EK80. All cables running between system cabinets located in different rooms and/or on different decks must be supported and protected along their entire lengths using conduits and/or cable trays.
Power Supply Unit. This is important to reduce noise. Related topics Installation requirements, page 37 Simrad EK80, page 13 Dry docking requirements Whenever one or more transducers are mounted under the vessel’s hull, special considerations must be made prior to dry docking.
The damage done if a remote computer succeeds doing this. Kongsberg Maritime has no information regarding the complete system installation on any vessel. Systems provided by Kongsberg Maritime are regarded as stand-alone offline systems. They are stand-alone even though they may be connected to a network for sensor interfaces and/or data distribution.
Simrad EK80 Support information If you need technical support for your Simrad EK80 you must contact your local dealer, or one of our support departments. A list of all our offices and dealers is provided on our website. You can also contact our main support office in Norway.
Page 44
Website • simrad.canada@simrad.com E-mail address Malaysia • : Kongsberg Maritime Malaysia Sdn. Bhd Company name • : Unit 27-5 Signature Offices, The Boulevard, Mid Val- Address ley City, Lingkaran Syed Putra, 59200 Kuala Lumpur, Malaysia • : +65 6411 7488 Telephone •...
Simrad EK80 Installation Manual Installation summary Installation of the EK80 is a demanding task that requires careful preparations, a number of specific procedures, wiring and required system settings. Context An overall installation procedure is provided. This procedure does not describe any detailed tasks.
Page 47
Preparations Note The installation shipyard must provide all necessary design and installation drawings, as well as the relevant work standards and mounting procedures. If required, all documents provided by the shipyard for the physical installation of the EK80 must be approved by the vessel’s national registry and corresponding maritime authority and/or classification society.
The shipowner and shipyard doing the installation are responsible for obtaining and paying for such approval. Kongsberg Maritime offers free advice for installation planning. Proposed arrangements may be sent for commentary or suggestions. The following drawings should be submitted should assistance be requested: •...
Preparations Related topics Preparations, page 43 Personnel qualifications The installation of the EK80 is a demanding task. It is very important that the personnel involved in the installation tasks are competent and experienced craftsmen. As a minimum, the following certified craftsmen must be available. •...
Simrad EK80 Installation Manual Where to install the transducer A single answer to the question "where to install the transducer" cannot be given. The physical location of the transducer depends on the vessel's design and construction, how the hull is shaped, and how the water runs along the hull. There are however a number of important guidelines, and some of these are even conflicting.
The effect of slamming can be reduced by mounting the transducer as deep as possible on the hull. Note Kongsberg Maritime AS takes no responsibility for any damages to the transducer, the cable or the mounting arrangement, caused by slamming. Related topics...
Simrad EK80 Installation Manual Mount the transducer at forward part of hull to minimize the effects from the flow boundary water layer The upper water layers of the sea contain a myriad of small air bubbles created by the breaking waves. When the hull moves through water it will cause a disturbance, and this will generate friction.
Preparations Keep the transducer far away from the propellers The propulsion propellers is the dominant noise source on most vessels. The noise is easily transmitted through the water. This noise may often reduce the overall performance of your EK80. The transducer must be installed as far away from the propellers as possible. The best positions are therefore on the fore part of the hull.
Simrad EK80 Installation Manual Summary and general recommendations Some of the installation guidelines provided for transducer location may be conflicting. For this reason, each vessel must be treated individually in order to find the best compromise. In general, the most important factor is to avoid air bubbles in front of the transducer face.
Page 55
Preparations If the vessel hull has a bulbous bow, this may well be a good transducer location, but also in this case the flow pattern of the aerated water must be taken into consideration. The foremost part of the bulb is often a good location. Thruster Transducer location This applies to the vessel in normal trim and speed.
Simrad EK80 Installation Manual Acoustic noise As with any other hydroacoustic systems, the quality of the EK80 echo data and presentations are subject to unwanted acoustic noise. The echoes from any large and small target must be detected inside the noise.
Page 57
Preparations expressed in decibels. A ratio higher than 1:1 (greater than 0 dB) indicates more signal than noise. While SNR is commonly quoted for electrical signals, it can be applied to any form of signal [...]. Wikipedia, Copied September 2013 The signal is the echo that we want to know something about, while the noise is any unwanted signals or disturbances.
Simrad EK80 Installation Manual Signal processing circuitry can create digital noise. Related topics Acoustic noise, page 54 Preparations, page 43 Self noise Any vessel equipped with a hydroacoustic system (for example echo sounder or sonar) will produce more or less self noise.
Page 59
Preparations Cavitation Cavitation is the formation of small air bubbles close to the transducer face. The bubbles appear because the local pressure becomes negative during parts of the acoustic pressure cycles. The cavitation threshold increases with the hydrostatic pressure. The noise is made when the bubbles implode.
Simrad EK80 Installation Manual thickness depends on ships speed and on the roughness of the hull. All objects sticking out from the hull, or dents in the hull, will disturb the flow and will increase the thickness of the boundary layer. When the flow speed is high, the turbulence can be violent enough to destroy the integrity of the water.
Preparations Related topics Acoustic noise, page 54 Preparations, page 43 Fishing gear noise Whenever your fishing gear is in use, it will create noise. A bottom trawl, for instance, is a considerable source of acoustic noise. Still, this noise from the fishing gear will seldom be a limiting factor for hull mounted sonars or echo sounders.
Page 62
Simrad EK80 Installation Manual Note The information here must be considered as general advice. Each EK80 installation must be handled separately depending on the hull design and the other electrical and mechanical systems installed on the vessel. Reducing flow noise •...
Preparations Reducing rattle noise Ensure that no parts near the transducers can rattle as a result of water flow or vibrations. Reducing interference Interference from the transmission pulses from other hydroacoustic instruments on board the vessel is difficult to avoid. The problem may be reduced by choosing the working frequencies carefully and to some extent by separating the different transducers.
Page 64
Simrad EK80 Installation Manual while a motion sensor is located close to the vessel’s centre of gravity. Both of these are physically positioned far away from the transducer on a depth sensor, which may be located closer to the bow. Very often, the information from one sensor depends on data from an other.
Page 65
Preparations Coordinate system alternative origins If necessary, other origin locations may be defined for specific products or purposes. One example is the Navigation Reference Point that is frequently used. Whenever a vessel is surveyed to establish accurate offset information, the surveyor may also establish an alternative origin location.
Simrad EK80 Installation Manual Installing the EK80 hardware units Topics Installing the Wide Band Transceiver (WBT) using the integrated brackets, page 65 Installing the Wide Band Transceiver (WBT) in a 19" rack, page 67 Installing the WBT Power Supply, page 69...
Installing the EK80 hardware units Installing the Wide Band Transceiver (WBT) using the integrated brackets The EK80 Wide Band Transceiver (WBT) is normally positioned in a dedicated room in the vicinity of the transducer. The physical length of the cables limit the distance between each transducer and the Wide Band Transceiver (WBT).
Page 68
Simrad EK80 Installation Manual Observe the installation requirements. Depending on the local requirements and preferences, the Wide Band Transceiver (WBT) can be installed on the bulkhead, inside a console, in a cabinet or 19” rack, or on a desk. The position must be chosen to fit the available cable lengths between the Wide Band Transceiver (WBT) and the other units it connects to.
Installing the EK80 hardware units Installing the Wide Band Transceiver (WBT) in a 19" rack The Wide Band Transceiver (WBT) can be installed in a 19-inch rack by means of an optional drawer. You will need one drawer for each Wide Band Transceiver (WBT) unit. Prerequisites It is assumed that a suitable 19–inch rack has already been installed.
Page 70
Simrad EK80 Installation Manual Depending on the local requirements and preferences, the Wide Band Transceiver (WBT) can be installed on the bulkhead, inside a console, in a cabinet or 19” rack, or on a desk. The position must be chosen to fit the available cable lengths between the Wide Band Transceiver (WBT) and the other units it connects to.
Installing the EK80 hardware units Installing the WBT Power Supply The power supply provided with the Wide Band Transceiver (WBT)is a commercial type custom made for the EK80. A dedicated installation procedure is provided. Prerequisites A suitable location for the power supply must be defined prior to installation. If you place the unit on the bridge, observe the compass safe distance.
Page 72
Simrad EK80 Installation Manual Make sure that enough space is made available for maintenance purposes. Make sure that adequate ventilation is available to avoid overheating. Make sure that the installation method allows for the physical vibration, movements and forces normally experienced on a vessel.
Installing the EK80 hardware units Installing the display A display is a required part of the EK80 Wide band scientific echo sounder. For best readability, the display must be protected from glare and have the correct height and angle. The display is normally not included with the EK80 delivery. A generic procedure is provided.
Simrad EK80 Installation Manual Related topics Installing the EK80 hardware units, page 64 Equipment handling, page 320 Compass safe distance, page 301 Installing a commercial computer The Processor Unit can be installed inside a console, inside a suitable cabinet, in a 19"...
Page 75
Installing the EK80 hardware units Observe the compass safe distance. Make sure that enough space is made available for maintenance purposes. Make sure that adequate ventilation is available to avoid overheating. Make sure that the installation method allows for the physical vibration, movements and forces normally experienced on a vessel.
Simrad EK80 Installation Manual Installing the Enix Processor Unit The Processor Unit can be installed inside a console, inside a suitable cabinet, in a 19" rack or on a desk. When mounted on a horizontal foundation, for example inside a cabinet, rack or console, use the bottom plate with the two base rails.
Page 77
Installing the EK80 hardware units Note In order to allow for future maintenance, we recommend to mount the unit with its cables and connectors available for easy access. Make sure that the chosen location meets the installation requirements. Provide ample space around the computer. You must be able to reach and use the front and rear mounted connectors and on/off switches.
Simrad EK80 Installation Manual Related topics Installing the EK80 hardware units, page 64 385609 Processor Unit dimensions, page 310 Equipment handling, page 320 Compass safe distance, page 301 Installing the Ethernet switch If you use more than one Wide Band Transceiver (WBT), a high capacity Ethernet switch is required.
Page 79
Installing the EK80 hardware units Connect the cables. Note When you connect the cables, make sure that they are all properly secured, and able to withstand the vibration and movements of the vessel. Related topics Installing the EK80 hardware units, page 64 Equipment handling, page 320 Compass safe distance, page 301 394149/D...
Simrad EK80 Installation Manual Mounting the WBT Cabinet The WBT Cabinet is a customized 19"-inch instrument rack fitted with powerful shock absorbers. The cabinet can contain maximum seven custom drawers, and each of these will hold one Wide Band Transceiver (WBT) and its power supply. An Ethernet switch and a power distributor panel are included the bottom of the cabinet.
Page 81
The drawing is also included on the EK80 USB. Procedure Prepare the installation of the cabinet. Observe the outline dimensions drawing. The drawing is located in the Drawing file chapter in this manual. It can also be downloaded from our website. • https://www.kongsberg.com/simrad 394149/D...
Page 82
Simrad EK80 Installation Manual Note The outline dimensions drawing shows the initial size of an empty cabinet. When the cabinet is completed for normal operation, the weight will compress the bottom shock absorbers slightly. You must take this into consideration when you plan the mounting.
Installing the EK80 hardware units Mount the top shock absorber assembly. Remove the four lifting lugs. Mount the top shock absorber assembly using two of the same holes. Use spare bolts to close the remaining lifting lug holes. Place cabinet in its correct position on the bottom frame. Use four bolts through the bottom frame to secure the cabinet.
Page 84
Simrad EK80 Installation Manual Mounting bolts for the Wide Band Transceiver (WBT) Mounting bracket (not used) Holes for fastening and securing the cables Mounting bolts for the drawer assembly Mounting bolts for the drawer Note Ensure maximum physical distance between the Wide Band Transceiver (WBT) and the Power Supply Unit.
End user manuals and source drawings (normally in AutoCad format) can be downloaded from our website. • https://www.kongsberg.com/td Procedure Determine the physical location of the transducer. The decision must be based on: • The vessel drawings •...
Cable layout and interconnections Cable layout and interconnections Topics Read this first, page 86 Reducing electrical noise, page 86 Cable plans, page 88 List of EK80 cables, page 94 Installing the EK80 cables, page 97 Connections to specific hardware items, page 110 Setting up the EK80 in a synchronized system, page 126 Cable drawings and specifications, page 136 Basic cable requirements, page 167...
Read this first Detailed information about cable specifications, termination and connectors is provided. Unless otherwise specified, all cables are supplied by Kongsberg Maritime as a part of the EK80 delivery. Detailed drawings are provided for relevant cables. Each drawing provides additional information, and may, when applicable, include minimum specifications, connector terminations and the required number of cores.
Page 89
Cable layout and interconnections • Place the transducer cables in a metal conduit all the way from the transducer to the transceiver. Terminate the conduit as close to the transducer and transceiver as possible. • Make sure that the transducer cables are completely separated from other cables, boxes, other potential noise sources.
• Standard transceiver setup with EC150-3C units for acoustic Doppler current profiler (ADCP) functionality. The Wide Band Transceiver (WBT) used by the Simrad EK80 can be set up to work with maximum four -4- operational frequencies. This means that you can use four single frequency/single beam transducers, two dual frequency transducers, or one split beam transducer.
Cable layout and interconnections Topside cable plan The topside/bridge cables include those used to connect the EK80 Processor Unit and the display to each other, to AC mains power, and to external devices. One high capacity Ethernet cable connects the Processor Unit to the Wide Band Transceiver (WBT). Display (You can use more than one display on your EK80 Processor Unit depending on personal and/or operational preferences.) Processor Unit...
Simrad EK80 Installation Manual Sonar room cable plan with one transceiver The Wide Band Transceiver (WBT) cables include those used to connect the EK80 transceiver(s) to AC mains power, and to the transducer(s). Wide Band Transceiver (WBT) Power Supply Unit Depending on the operational requirements, one or more Wide Band Transceiver (WBT) units may be used in the complete EK80 system.
Cable layout and interconnections Sonar room cable plan with two transceivers The Wide Band Transceiver (WBT) cables include those used to connect the EK80 transceiver(s) to AC mains power, and to the transducer(s). Wide Band Transceiver (WBT) Power Supply Unit Ethernet switch Depending on the operational requirements, one or more Wide Band Transceiver (WBT) units may be used in the complete EK80 system.
Simrad EK80 Installation Manual Sonar room cable plan with WBT Cabinet The Wide Band Transceiver (WBT) cables include those used to connect the EK80 transceiver(s) to AC mains power, and to the transducer(s). The WBT Cabinet is provided with a built-in power distributor. Only one power cable is required for connection to AC mains.
Cable layout and interconnections EC150-3C cable plan The cables are used to connect the Power Supply Unit to the transducer and to the Processor Unit. Synchronization is an optional feature. Power Supply Unit Transducer Steel conduit Comments Cables identified with an asterisk (*) are system cables. These cables are supplied with the EK80 delivery.
Simrad EK80 Installation Manual List of EK80 cables A set of cables is required to connect the EK80 units to each other, and to the relevant power source(s). Additional cables are required to connect the EK80 to peripheral devices. Cables identified with an asterisk (*) are system or commercial cables. These cables are provided with the EK80 delivery or the relevant item.
Page 97
Cable layout and interconnections Cable Type From/To Minimum requirements C16* DC power cable From Power Supply Unit to Wide Band Transceiver (WBT) The DC power cable from the WBT power supply to the transceiver is provided with the power supply. The Wide Band Transceiver (WBT) can be powered by a large capacity battery.
Page 98
Simrad EK80 Installation Manual Cable Type From/To Minimum requirements C33** Transducer cable From Power Supply Unit to transducer The transducer cable is provided with the transducer. The transducer cable enters the Power Supply Unit through the cable gland at the bottom of the cabinet. The transducer cable is 40 metres long.
Only skilled and authorized personnel can install the EK80 cables. Kongsberg Maritime will not accept any responsibility for errors, malfunctions or damage to system or personnel caused by improper wiring. 394149/D...
Simrad EK80 Installation Manual Related topics Installing the EK80 cables, page 97 Cable layout and interconnections, page 85 Installing the EK80 topside cables The topside/bridge cables include those used to connect the EK80 Processor Unit and the display to each other, to AC mains power, and to external devices. One high capacity Ethernet cable connects the Processor Unit to the Wide Band Transceiver (WBT).
Page 101
Cable layout and interconnections To learn more about the various video standards, explore these Wikipedia pages. • • HDMI • DisplayPort Connect the cable from the Processor Unit to the keyboard. (C6) Connect the cable from the Processor Unit to the mouse (or another similar device). (C7) Connect the Ethernet cable from the Processor Unit to the Wide Band Transceiver (WBT).
Simrad EK80 Installation Manual Installing the Wide Band Transceiver (WBT) cables The Wide Band Transceiver (WBT) cables include those used to connect the EK80 units to AC mains power, as well as the control cables between the units. One high capacity Ethernet cable connects the Wide Band Transceiver (WBT) to the topside Processor Unit.
Page 103
Cable layout and interconnections Connect the transducer cables from each transducer to the relevant Wide Band Transceiver (WBT). Related topics Installing the EK80 cables, page 97 Cable layout and interconnections, page 85 394149/D...
Simrad EK80 Installation Manual Processor Unit rear connectors The rear panel on the Processor Unit holds connectors for the various EK80 cables. Additional connectors are provided on the front panel. These are not used. Not used Video cable: From Processor Unit to display (C5) This is a commercial cable.
Page 105
Cable layout and interconnections Ethernet cable: From Processor Unit to local area network (LAN) (C9) If you wish to connect the Processor Unit to the ship's local area network, use the left Ethernet socket on the connection panel. Do not use the adapter in Slot F. USB (Universal Serial Bus) sockets From Processor Unit to keyboard (C6) From Processor Unit to mouse (or another similar device) (C7)
Simrad EK80 Installation Manual Wide Band Transceiver (WBT) connectors All sockets for the system cables are located on the Wide Band Transceiver (WBT) side panel. Ground cable: From Wide Band Transceiver (WBT) to vessel ground (C15) Transducer cable: From Wide Band Transceiver (WBT) to transducer (C20)
Cable layout and interconnections Using a steel conduit to protect the transducer cable A steel conduit must be used to protect the transducer cable. The steel conduit must preferably be straight. Start the conduit immediately above the transducer, and terminate it well above the water line.
Page 108
Simrad EK80 Installation Manual Related topics Installing the EK80 cables, page 97 Cable layout and interconnections, page 85 394149/D...
The cable between the junction box and the transceiver must be supplied by Kongsberg Maritime, and this must be the same type as used on the transducer. Electrical installations can only be done by certified electricians. All necessary tools and instruments required must be available.
Page 110
Simrad EK80 Installation Manual The junction box is isolated from vessel ground. Cable gland Terminal block Cable Cable screen (Do not connect the cable screen to vessel ground.) Procedure Mount the junction box in a suitable location. Terminate the steel conduits...
Page 111
Cable layout and interconnections Junction box Cable gland Terminal block Cable Cable screen (Do not connect the cable screen to vessel ground.) The junction box may be connected to vessel ground. Procedure Mount the junction box in a suitable location. Terminate the steel conduit containing the transducer cable to the junction box housing, or...
Simrad EK80 Installation Manual Connections to specific hardware items Topics KVM (Keyboard Video Mouse) principle for a remote operating position, page 110 Processor Unit graphic adapter, page 112 Processor Unit serial adapter, page 114 Serial line splitter Øverland UPC-3005, page 118 Serial line splitter Øverland UPC–5000P, page 122...
Page 113
Cable layout and interconnections Ethernet cable between the KVM units is specified by the KVM manufacturer. Unless otherwise specified, this cable must be provided by the installation shipyard. Note Unless specified in a contract, a KVM (Keyboard Video Mouse) system is not included in the standard EK80 delivery.
Simrad EK80 Installation Manual Processor Unit graphic adapter The graphic adapter used by the Enix Processor Unit is the manufactured by ER93F TUL Embedded. Description The manufacturer’s website offers the following description of the ER39F graphic adapter. The ER93F Graphic Card is provided with...
Page 115
Cable layout and interconnections Graphic output formats The outputs from the graphic adapters are positioned as follows: Mini DisplayPort output Mini DisplayPort output HDMI output DVI-I output DVI-D output Note The two DVI outputs are not identical. If you wish to connect a standard VGA display using a DVI-to-VGA adapter, you must use the left output (D).
Simrad EK80 Installation Manual Processor Unit serial adapter The Moxa CP114EL-I adapter is used in the EK80 Processor Unit to provide serial communication. Topics Moxa CP114EL-I overview, page 114 Moxa CP114EL-I connectors, page 115 Setting up the Moxa CP114EL-I serial ports, page 116 Moxa CP114EL-I overview The Processor Unit is equipped with a Moxa CP114EL-I serial adapter board.
Page 117
Cable layout and interconnections Moxa CP114EL-I connectors The serial lines are connected using a large D-Subminiature connector on the rear side of the Processor Unit. Adapter A dedicated adapter cable is provided with the EK80 delivery. The adapter splits the large circuit board connector to four 9-pin D-Subminiature connectors.
Page 118
Processor Unit, you will only need to do this once. Note This information is intended for certified maintenance technicians and service engineers from Kongsberg Maritime, or from a certified dealer, distributor or agent. It is assumed that you are familiar with the Windows ® operating systems, computer technology, and interface principles.
Page 119
Cable layout and interconnections Set up the interface parameters for the chosen port to suit your preferences. Unless you a familiar with interface parameters offered, change only the parameter to Interface the required format. Leave the other settings with their default values. Click repeatedly to save you settings and exit the utility.
Simrad EK80 Installation Manual Serial line splitter Øverland UPC-3005 On large installations with many hydroacoustic systems, these often require the same navigational information from a single sensor. Information such as current depth or speed is provided on serial format. One or more serial line splitters can be used to distribute the information from a single sensor to several different recipients.
Page 121
Cable layout and interconnections UPC-3005 Technical specifications The Øverland UPC-3005 serial line splitter offers one input and eight RS-232 and RS-422 outputs. • : +15 - 30 VDC (2 W) Power requirements • : NMEA0183, RS-232, RS422, Input RS484, Current loop •...
Page 122
Simrad EK80 Installation Manual UPC-3005 Connections The Øverland UPC-3005 serial line splitter offers one input and eight RS-232 and RS-422 outputs. The serial line splitter requires a dedicated power supply providing 15 to 30 VDC. Power requirements: +15 - 30 VDC...
Page 123
Cable layout and interconnections UPC-3005 Dimensions Related topics Serial line splitter Øverland UPC-3005, page 118 Cable plans, page 88 Cable layout and interconnections, page 85 394149/D...
Simrad EK80 Installation Manual Serial line splitter Øverland UPC–5000P On large installations with many hydroacoustic systems, these often require the same navigational information from a single sensor. Information such as current depth or speed is provided on serial format. One or more serial line splitters can be used to distribute the information from a single sensor to several different recipients.
Page 125
Cable layout and interconnections Related topics Serial line splitter Øverland UPC–5000P, page 122 Cable plans, page 88 Cable layout and interconnections, page 85 UPC-5000P Technical specifications The Øverland UPC-5000P serial line splitter offers two separate inputs and fifteen RS-232 and RS-422 outputs. •...
Page 126
Simrad EK80 Installation Manual UPC-5000P Connections The Øverland UPC-5000P serial line splitter offers two separate inputs and fifteen RS-232 and RS-422 outputs. The serial line splitter requires a dedicated power supply providing 15 to 30 VDC. Outputs: 5 x RS-232...
Page 127
Cable layout and interconnections UPC-5000P Dimensions Related topics Serial line splitter Øverland UPC–5000P, page 122 Cable plans, page 88 Cable layout and interconnections, page 85 394149/D...
— April 2016 The Simrad EK80 may be set up to be synchronized with other hydroacoustic instruments. Synchronization is necessary to prevent several hydroacoustic systems from transmitting simultaneously. Individual transmission is often a necessity to prevent interference.
Cable layout and interconnections Synchronization modes The purpose of the synchronization modes are to set up the EK80 to operate alone, or as a "master" or "slave" in a synchronized system. Whenever more than one hydroacoustic system is installed on a vessel, interference may occur.
Simrad EK80 Installation Manual Synchronization sequences In many applications, the synchronisation interface is based on an RS-232 serial port. When you connect two systems for synchronisation using Clear to Send (CTS) and Request to Send (RTS), one system must set up as a "Master" and the other as a "Slave".
Cable layout and interconnections Synchronization using Clear To Send (CTS) and Request To Send (RTS) signals In many applications, the synchronisation interface is based on an RS-232 serial port. Only the Clear to Send (CTS) and Request to Send (RTS) connections of the RS-232 interface are then used.
Page 132
The socket fits a Conxall 7-pin Mini-Con-X ® shielded plug. The connections are made on pins 2, 3 and 5. The plug can be ordered from the manufacturer or purchased from Kongsberg Maritime. Use part number 387563. • : Switchcraft Conxall Manufacturer •...
Cable layout and interconnections Synchronizing the EK80 by means of a serial port If you want to use the EK80 as a master or slave in a synchronized system, you must set it up for such operation. To do this, you must select which communication port to use for the synchronization interface, and you must select the requested synchronization mode.
Page 134
Simrad EK80 Installation Manual serial line cable does not exceed approximately 50 meters. If a longer cable is required, you may need to use buffer amplifiers. If the Processor Unit is not fitted with a suitable serial line connector, use a USB-to-serial converter.
Page 135
Cable layout and interconnections Slave mode is used if the EK80 is going to transmit only when permitted by a peripheral system. When Slave mode is selected, the EK80 does not transmit ("ping") unless an external trigger appears on the chosen synchronization port. The peripheral system may be any other hydroacoustic product (for example an echo sounder or sonar), or even a dedicated synchronization system.
The socket fits a Conxall 7-pin Mini-Con-X ® shielded plug. The connections are made on pins 2, 3 and 5. The plug can be ordered from the manufacturer or purchased from Kongsberg Maritime. Use part number 387563. • : Switchcraft Conxall Manufacturer •...
Page 137
Cable layout and interconnections Note If you use more than one Wide Band Transceiver (WBT) in your EK80 system, all Auxiliary synchronization input signals to the ports must be provided by the same source. Individual synchronization of a single Wide Band Transceiver (WBT) is not supported.
Simrad EK80 Installation Manual Cable drawings and specifications Topics AC power cable using IEC C13 inline socket, page 137 Ground cable, page 139 RS-232 serial line connection using three wires, page 140 RS-232 serial line connection using five wires, page 141...
Cable layout and interconnections AC power cable using IEC C13 inline socket This cable is used to connect any unit or device to AC mains supply. It is commercial, and normally used for 115 and 230 VAC. The inline socket and plug comply to the IEC60320 standard.
Page 140
Simrad EK80 Installation Manual Minimum cable requirements • : 2 x 1.5 mm + 1.5 mm Ground Conductors • : None Screen • : 750 V Voltage • : Defined by the plugs and/or the cable gland Maximum outer diameter...
Cable layout and interconnections Ground cable Correct grounding is essential for safe operation and maximum performance. Ground tag on unit Vessel ground The ground connection is made using a thick stranded (or yellow/green) cable making a solid connection between the cabinet and the bulkhead. It is normally provided with a green/yellow colour.
Simrad EK80 Installation Manual RS-232 serial line connection using three wires An RS-232 serial line connection using three (3) wires and NMEA datagrams is a common way to connect the EK80 to external devices. Local connection Connection on remote device...
Cable layout and interconnections RS-232 serial line connection using five wires An RS-232 serial line connection using five (5) wires and NMEA datagrams is a common way to connect the EK80 to external devices. Local connection Connection on remote device Female 9-pin D-Subminiature connector Male 9-pin D-Subminiature connector Unless otherwise specified, this cable must be provided...
Simrad EK80 Installation Manual RS-422 serial line connection using five wires An RS-422 serial line connection can transmit data at rates as high as 10 million bits per second, and may be sent on cables as long as 1500 meters.
Cable layout and interconnections RS-232 used as synchronization trigger (input or output) An RS-232 serial line connection using the Request To Send (RTS) and Clear To Send (CTS) signals is common way to connect the EK80 to external devices for synchronization purposes.
Simrad EK80 Installation Manual RS-485 serial line connection using two or four wires An RS-485 serial line connection using two or four wires is common way to connect the EK80 to external devices. This format is recommended if the serial cable needs to be very long.
Cable layout and interconnections Moxa CP114EL-I Serial line adapter The Processor Unit is equipped with a Moxa CP114EL-I serial adapter board. The board provides four serial lines. The serial lines are connected using a large D-Subminiature connector on the rear side of the Processor Unit. The Moxa CP114EL-I serial adapter supports RS-232, RS-422 and RS-485 (both 2 and 4-wire).
Page 148
Simrad EK80 Installation Manual RS-232 connection to your peripheral device work properly, you must always consult the relevant instructions provided by the device manufacturer. Pin configuration Moxa CP114EL-I connectors / Adapter cable RS-232 RS-422 RS-485 (4-wire) RS-485 (2-wire) TXD-(A) TXD-(A)
Cable layout and interconnections RJ45 High speed Ethernet cable (1000Base-t) Most high speed data connections between the EK80 system units are made using Ethernet cables. These cables may also be used between the EK80 and peripheral equipment. Local Ethernet connection Connection on external network device Ethernet cables are available...
EK80 delivery. You can use this plug if you wish to operate the transceiver from a battery. The plug can be ordered from the manufacturer or purchased from Kongsberg Maritime. Use part number 390616. • : Switchcraft Conxall Manufacturer •...
Page 151
Cable layout and interconnections Pin number Signal Signal description Trigger Out This signal is transmitted to the system that needs to be synchronized. Trigger Out allows the system to transmit ("ping"). Ground Mandatory! This ground is connected to pin 5 inside the IO Module.
Page 152
Simrad EK80 Installation Manual Connectors 1 through 6 as indicated by the arrows. Note that each of the two connector elements can be pulled out of the IO Module for easy access. Configuration board Unless otherwise specified, this cable must be provided by the installation shipyard.
Cable layout and interconnections Simrad TU40 interface to generic RS-232 synchronization input For transmission synchronization purposes, the Simrad TU40 will interface a generic RS-232 serial line communication port using the CTS (Clear To Send) and RTS (Request To Send) signals. The NotUsed provides one output and one input for each hydroacoustic system that needs to be synchronized.
Page 154
Simrad EK80 Installation Manual Screen (Cable screen) (Green) Input (Ready to Transmit (RTT)) Ground (Signal ground) Output (Trigger Out) Make the connections here. Channels (From left) Minimum cable requirements Unless otherwise specified, this cable must be provided by the installation shipyard. If you need to install a very long cable, increase the cross section.
The socket fits a Conxall 7-pin Mini-Con-X ® shielded plug. The connections are made on pins 2, 3 and 5. The plug can be ordered from the manufacturer or purchased from Kongsberg Maritime. Use part number 387563. • : Switchcraft Conxall Manufacturer •...
Simrad EK80 Installation Manual Single beam low power transducer connection to a circular transducer socket Maximum four single beam low power transducers can be connected to terminals A through J on the circular 12-pin Amphenol transducer socket (Type 97-12-19S). This socket is used on the General Purpose Transceiver (GPT), and on several versions of the Wide Band Transceiver (WBT).
Page 157
License 1 License 2 License 3 License 4 Minimum cable requirements Not applicable. If you need an extension cable, contact your dealer (or Kongsberg Maritime) for support. Related topics Cable drawings and specifications, page 136 Cable layout and interconnections, page 85...
Simrad EK80 Installation Manual Split beam transducer connection to an Amphenol socket A split beam transducer is connected to terminals A through J on the circular 12-pin Amphenol transducer socket (Type 97-12-19S). This socket is used on the General Purpose Transceiver (GPT), and on several versions of the Wide Band Transceiver (WBT).
Page 159
Cable layout and interconnections Cable with colour coded conductors Cable with colour coded conductors Sector Cable colours Terminal on socket Transceiver channel White Black Green Black Yellow Black Blue Black Digital output Digital ground Black Cable screen Screen Cable with only black and white conductors The cable has four pairs of white and black conductors.
Page 160
• Splicing using a junction box that is isolated from vessel’s ground Refer to the dedicated procedures. Minimum cable requirements Not applicable. If you need an extension cable, contact your dealer (or Kongsberg Maritime) for support. Note The software license controls how the transducer is connected to the Wide Band Transceiver (WBT).
Cable layout and interconnections Split beam transducer connection for single beam use on an Amphenol socket A split beam transducer can be connected to sockets A and D on a circular 12-pin Amphenol transducer socket (Type 97-12-19S). This allows you to use the transducer as a single beam unit.
Page 162
Simrad EK80 Installation Manual Cable with colour coded conductors Cable with colour coded conductors Sector Cable colours Terminal on socket Transceiver channel White Black Green Black Yellow Black Blue Black Digital output Digital ground Black Cable screen Screen Do not connect Digital output and Digital ground to the transceiver socket.
Page 163
• Splicing using a junction box that is isolated from vessel’s ground Refer to the dedicated procedures. Minimum cable requirements Not applicable. If you need an extension cable, contact your dealer (or Kongsberg Maritime) for support. Related topics Cable drawings and specifications, page 136...
Simrad EK80 Installation Manual Burton underwater connectors on split beam transducers for deep water A selection of the Simrad transducers have been designed to operate in deep water. These are intended for installation in subsea constructions, with autonomous transceivers, or inside a towed body.Several of the Simrad transducers for deep water operation have...
Page 165
Cable layout and interconnections Pin configuration Pin on Sectors Pin on Sector connector GPT connector position Sector 1 (+) Aft starboard Sector 1 (-) Sector 2 (+) Aft port Sector 2 (-) Fore port Sector 3 (+) Sector 3 (-) Sector 4 (+) Fore starboard Sector 4 (-)
Simrad EK80 Installation Manual About serial lines A preferred method to establish communication between the EK80 and peripheral devices, is by means of serial lines. Several serial line standards are available, each with different qualities. Unless otherwise specified, these cables must be provided by the installation shipyard.
Page 167
Cable layout and interconnections Note There are no common standard for RS-422 pin configuration. Any manufacturer may choose their own connector pins for the various signals used. In order to make the RS-422 connection to your peripheral device work properly, you must always consult the relevant instructions provided by the device manufacturer.
Page 168
Simrad EK80 Installation Manual Related topics Cable drawings and specifications, page 136 RS-232 serial line connection using five wires, page 141 RS-422 serial line connection using five wires, page 142 RS-232 used as synchronization trigger (input or output), page 143...
Cable layout and interconnections Basic cable requirements It is very important that all systems cables are installed correctly. All cables must be properly supported and protected, and all relevant precautions must be made to prevent unwanted noise. Topics Cable trays, page 167 Radio frequency interference, page 168 Physical protection of cables, page 168 Grounding of system cables, page 169...
Simrad EK80 Installation Manual conduit or duct). When this is impractical, the cables must be carefully arranged such that the maximum temperature expected in any cable in the group is within the specifications of the lowest-rated cable. Cables with protective coverings which may damage other cables should not be grouped with other cables.
Cable layout and interconnections Metallic materials used for the physical protection of cables must be suitably protected against corrosion. Related topics Basic cable requirements, page 167 Cable layout and interconnections, page 85 Grounding of system cables All metallic cable coverings (armour, metallic sheathing and other protection) must be electrically connected to the vessel's hull at both ends except in the case of final sub-circuits where they should be connected at the supply end only.
There are many different types of cable gland on the market. The cable glands are not supplied with the system. Note Even though the cabinets from Kongsberg Maritime may be prepared for specific types of cable glands, the installation shipyard will be responsible for selecting cable gland types and installing them.
Page 173
There are many different types of cable gland on the market. This procedure describes the types used (now and previously) as standard in the units manufactured by Kongsberg Maritime. Even though the cabinets from Kongsberg Maritime may be prepared for specific types, the installation shipyard will be responsible for selecting cable gland types and installing them.
Page 174
Simrad EK80 Installation Manual Procedure Ensure all the cables to be connected are completely isolated from any power sources. For safety reasons, switch off and remove the power supply fuses from any units or systems into which the cables are already connected.
Page 175
Cable layout and interconnections Securing and terminating cables Once a cable has been prepared for termination, it must be connected to a unit or cabinet. Prerequisites Electrical installations can only be done by certified electricians. All necessary tools and instruments required must be available. The installation shipyard must prepare detailed drawings of the electrical system, and identify each cable.
Page 176
Simrad EK80 Installation Manual Using multi-diameter cable sealing Cable sealing systems are available from several manufacturers, and multi-diameter types are becoming increasingly popular due to their ease of use. Prerequisites Electrical installations can only be done by certified electricians. All necessary tools and instruments required must be available.
Page 177
Cable layout and interconnections Illustration: Roxtec steps (Image from Roxtec website) The Roxtec system is available with a large number of various modules and compression units. The system complies with current screening and EMC requirements. Procedure Cut an opening in the structure (bulkhead, cabinet etc) you wish to penetrate.
Simrad EK80 Installation Manual Dimensional surveying The Simrad EK80 Wide band scientific echo sounder is a precision instrument. In order to provide data that are both detailed and correct you must align, position and calibrate the sensors and each transduceron your vessel.
Dimensional surveying Quality assurance of EK80 data The Simrad EK80 Wide band scientific echo sounder is a precision instrument for scientific measurements. The EK80 has been designed for target strength measurements of objects in the water column. In order to obtain precision data that are both detailed and correct, it is necessary to align the transducer, measure the location and offset of each sensor in relation to the vessel’s coordinate system, and calibrate the complete EK80 prior to use.
Page 180
We recommend that you use third-party consultants with well proven experience with vessel dimensional control. Sufficient time and satisfactory work conditions must be given to the survey work. The installation engineers from Kongsberg Maritime are neither equipped nor trained to do dimensional surveying.
We recommend that you use third-party consultants with well proven experience with vessel dimensional control. Sufficient time and satisfactory work conditions must be given to the survey work. The installation engineers from Kongsberg Maritime are neither equipped nor trained to do dimensional surveying.
Page 182
Simrad EK80 Installation Manual Note Modest accuracy requirements apply when your EK80 system is only used to investigate objects in the water column. When used for acoustic Doppler current profiler (ADCP) measurements the accuracy requirements are increased. For all measurements, observe the relevant accuracy requirements.
Dimensional surveying Dimensional survey accuracy requirements for ADCP operations Minimum accuracy requirements are defined for the dimensional survey. Higher accuracy will provide better survey results. Modest accuracy requirements apply when your EK80 system is only used to investigate objects in the water column. When used for acoustic Doppler current profiler (ADCP) measurements the accuracy requirements are increased.The accuracy requirements provided have been determined from considerations on how they contribute to the total EK80 accuracy.
Simrad EK80 Installation Manual Related topics Dimensional surveying, page 176 Dimensional survey accuracy requirements for echo sounding operations No specific requirements have been defined for the dimensional survey. Related topics Dimensional surveying, page 176 Vessel coordinate system The vessel coordinate system is established to define the relative physical locations of systems and sensors.
Page 185
Dimensional surveying In order to establish a system to measure the relative distance between sensors, a virtual coordinate system is established. This coordinate system uses three vectors; X, Y and Z. The X-axis is the longitudinal direction of the vessel, and in parallel with the deck.
Page 186
Simrad EK80 Installation Manual Defining the physical location of each sensor By means of the vessel coordinate system, the physical location of every sensor can be defined using three numerical values for X, Y and Z. These values must define the vertical and horizontal distances from a single reference point;...
Setting to work Setting to work Topics Setting to work summary, page 186 Making sure that the EK80 is ready for operational use, page 188 Turning on the EK80 for the first time, page 199 Installing and troubleshooting Network Time Protocol (NTP), page 214 Configuring the EK80 for normal operation, page 224 Interfacing peripheral equipment, page 228 Test procedures, page 256...
Simrad EK80 Installation Manual Setting to work summary Once all the hardware units have been installed, and all the cables have been connected, the EK80 can be turned on for the first time, and set to work. Prerequisites Before you can set the EK80 to work, the following work must be finalized.
Page 189
Setting to work On the page, connect the transducer(s) to the Transceiver Installation transceiver(s). • Turning on the EK80 for the first time, page 199 • Installing and troubleshooting Network Time Protocol (NTP), page 214 • Configuring the EK80 for normal operation, page 224 Set up the interfaces with the external devices (navigation sensors and other peripherals).
Simrad EK80 Installation Manual Making sure that the EK80 is ready for operational use Topics Making sure that the AC mains supply voltage is correct, page 188 Making sure that all EK80 cables are properly connected, page 189 Visual inspection of the display, page 190...
Setting to work Related topics Making sure that the EK80 is ready for operational use, page 188 Making sure that all EK80 cables are properly connected The EK80 relies on communication between each system unit, and between the EK80 and external devices. It is very important that all cables are correctly installed, that the proper cable types have been used, and that all cables are connected correctly.
You need the following equipment: • Multimeter Context This test procedure is only applicable when the display is provided by Kongsberg Maritime as a part of the EK80 delivery. Procedure Make sure that the display is installed in the correct location, and that it is suitably orientated with respect to ambient light conditions and reflections.
Page 193
Setting to work Make sure that the correct flat and shake-proof washers have been used. Make sure that all the nuts have been tightened properly. Make sure that all welds and brackets have been painted with the correct preservation medium to prevent corrosion. Make sure that the unit is not physically damaged, and that the surfaces and paint-work are clean without dents or scratches.
You need the following equipment: • Multimeter Context This test procedure is only applicable when the Processor Unit is provided by Kongsberg Maritime as a part of the EK80 delivery. Procedure Make sure that the computer is installed in the correct location, and that it is suitably oriented for replacement and cabling.
Setting to work Make sure that the unit is securely connected to the ship's ground with an earthing strap. The strap must be in addition to any incidental electrical contact made by the mounting lugs on the unit. Use a standard multimeter to check that the resistance between the unit and the ship's ground is approximately 0 (zero) Ω.
Page 196
Simrad EK80 Installation Manual Procedure Make sure that the Wide Band Transceiver (WBT) is installed in the correct location, and that it is suitably oriented for easy maintenance and replacement of parts. Make sure that the physical installation of the unit has been completed.
Setting to work Result Requirements Results The Wide Band Transceiver (WBT) is correctly installed with easy access for maintenance and replacement of parts. The Wide Band Transceiver (WBT) is free from scratches, dents or other physical damage. Free access to all the connectors on the Wide Band Transceiver (WBT) are provided.
Page 198
Simrad EK80 Installation Manual Make sure that the bolts, screws or studs that have been used are all of the correct size. Make sure that the correct flat and shake-proof washers have been used. Make sure that all the nuts have been tightened properly.
Setting to work Results Requirements The welds and brackets that support the cabinet are strong enough to hold the unit securely in place under all operating conditions. The welds and brackets have been painted with the correct preservation medium to prevent corrosion.
Page 200
Simrad EK80 Installation Manual Make sure that the unit is not physically damaged, and that the surfaces and paint-work are clean without dents or scratches. The physical handling during the installation may have caused some minor scratches to the surfaces or paint-work. This can be accepted. However, if rough handling has caused serious damage, this must be recorded with a written statement and necessary photos, so that corrective actions can be made.
Setting to work Turning on the EK80 for the first time Topics Setting up summary, page 199 Installing the EK80 operational software, page 201 Turning on the EK80 to Passive mode, page 202 Obtaining and installing the software license, page 203 Defining the IP address on the Processor Unit network adapter for communication with the transceiver, page 205 Installing one or more transducers, page 206...
Page 202
Simrad EK80 Installation Manual Open the operating systems’s Network and Sharing Center, and set the IP address for the network adapter used to communicate with the transceiver. • : 157.237.15.12 IP Address Any address can be used, but 157.237.15.12 is recommended for legacy reasons.
Setting to work Further requirements To obtain quantitative data, the EK80 must be calibrated. Observe the summary procedure, and the complete description, in the EK80 Reference manual and on-line help. Related topics Turning on the EK80 for the first time, page 199 Setting to work, page 185 Installing the EK80 operational software If your EK80 Wide band scientific echo sounder is provided with a Processor Unit, the...
Simrad EK80 Installation Manual Once the software installation has been completed, double-click the icon on the desktop to start the program. Depending on your operating system parameters, certain dialog boxes may open. The Windows ® Firewall may open a dialog box requesting information about the network.
Setting to work Turn on the Processor Unit. Wait while the operating system loads. On the Processor Unit desktop, double-click the EK80 icon to start the program. Select user settings. During the program load, a dialog box appears to let you choose from the current user settings available on the EK80.
Page 206
Simrad EK80 Installation Manual In order to obtain a software license you must contact a Simrad dealer or distributor. You can also use the request form on https://www.simrad.com/support, or contact our support department directly. Note This information is only valid if your EK80 is meant to operate with one (or more) of the following transceivers: •...
Setting to work Select to save the license string and close the dialog box. Type License String Verify that the license string is placed in the list. Currently active licenses If necessary, select the license string on the left side, and click the arrow button [>] to move it to the list.
Simrad EK80 Installation Manual Any address can be used, but 157.237.15.12 is recommended for legacy reasons. This is particularly important if your system contains old GPT transceivers. • : 255.255.255.0 Subnet mask You can leave blank and select . When you see an error message...
Page 209
This allows each transceiver to optimise its performance for the individual transducer models. If you cannot find your transducer in the list, contact you dealer, agent or Kongsberg Maritime to upgrade the relevant software component in the EK80.
Page 210
Simrad EK80 Installation Manual Note These settings are intended for the installation of an ADCP transceiver for current profiling. The information is not used to adjust for installation misalignments, but will be included in the RAW files for post-processing purposes.
Page 211
Setting to work Lift the front end of the transducer up, so that the indicator arrow moves up. This is a Rotation around Y Proceed until the requested angle has been reached. Example: If a 30-degree Y angle is requested, the must Rotation around Y be set to 60 degrees (that is the angle from the default position).
Simrad EK80 Installation Manual Installing transceiver channels In order to use the EK80, the Processor Unit must be connected to one or more transceivers, and each of them must in turn be connected to one or more transducers. Each channel must be installed before it can be put to use. In this context, the phrase channel is used as a common term to identify the combination of transceiver, transducer and operating frequency.
Page 213
Setting to work Observe that the dialog box opens. This dialog box contains a number Installation of pages selected from the menu on the left side. On the left side of the dialog box, select Installation Transceiver Install the channels(s). Observe that the transceiver(s) you have connected to the Processor Unit are listed.
Simrad EK80 Installation Manual Result When all channels have been installed, you can start normal operation. Caution You must never set the EK80 to "ping" unless the transducer is submerged in water. Most transducers are damaged beyond repair if they transmit in open air. Prevent inadvertent use of the EK80 whenever a transducer is not submerged.
Page 215
Setting to work Observe that the Control Panel opens. In the dialog box, under , select Control Panel Appearance and Personalization Adjust screen resolution Change the display settings. Make sure that the correct display is shown. Change the resolution to maximum permitted resolution for the display. Select Observe that the screen resolution changes.
Simrad EK80 Installation Manual Installing and troubleshooting Network Time Protocol (NTP) NTP (Network Time Protocol) is a network protocol that enables you to synchronize the clocks on devices over a network. It uses one or more NTP servers to maintain a highly accurate time, and allows clients to query for this time.When clients query the server...
Page 217
Setting to work Type the following URL in the address field: https://www.meinbergglobal.com/english/sw/ntp.htm Download and install the latest release of the NTP application. "NTP for Windows XP and newer, with IPv6 support" Example: ntp-4.2.8p14-win32-setup.exe Select for license agreement. I agree Keep the suggested Destination Folder Installation Location Select...
Page 218
Simrad EK80 Installation Manual Select the following options by checking the check boxes: • NTP Dameon • NTP Tools • NTP Documentation • Create Start menu Select to continue. Next Select configuration file settings. Select the following options by checking the check boxes: •...
Page 219
Setting to work • Create an initial configuration file with the following settings • Predefined public NTP servers None • (Use the IP address of your Specify the NTP server IP address 10.124.24.200 Master clock, this is an exmaple) • Use fast initial sync mode (iburst) •...
Simrad EK80 Installation Manual • Check Firewall Settings Select to continue. Next 10 Select to close the wizard. Finish Related topics Installing and troubleshooting Network Time Protocol (NTP), page 214 Installing Network Time Protocol (NTP) monitor The NTP Server Monitor is a software utility that runs on any Windows platform, workstation or server.
Page 221
Setting to work • Change the service settings without the need to open the device manager each time. • Extract the NTP related application log entries and display them separately in a table. • Display the current status of the running NTP service. •...
Page 222
Simrad EK80 Installation Manual Select Destination Folder C:\Program Files(x86)\meinberg\ntp_time_server_monitor Select to continue. Next Type the name of the Program Manager Group Meinberg Select to continue. Next 394149/D...
Page 223
Setting to work Start the installation by selecting Next Select to close the wizard. Finish 394149/D...
Simrad EK80 Installation Manual Start from the desktop. NTP Time Server Monitor Verify that the NTP service operates normally. Make sure that the service is in Started mode on the tab. NTP Service Make sure that the IP addresses and synchronized device are in OK mode on the tab.
Page 225
Setting to work Adjust the firewall settings. Check the communication between the EK80 NTP server and the client(s). You can use Wireshark (https://www.wireshark.org). This is a network protocol analyser. Wireshark allows you to see your network activities at a microscopic level. Related topics Installing and troubleshooting Network Time Protocol (NTP), page 214 394149/D...
Simrad EK80 Installation Manual Configuring the EK80 for normal operation Topics Selecting menu language, page 224 Selecting measurement units, page 225 Defining the raw data recording parameters, page 225 Selecting menu language You may prefer to use the EK80 with a user interface in your own language.
Setting to work Selecting measurement units The EK80 is prepared to work with several international standards for units of measurements. From the page you control which units of measurements that are Units used. Context The EK80 user interface presents many measurements. These measurements are for example related to depth, range and distance.
Page 228
Simrad EK80 Installation Manual can identify the files you have recorded during a specific mission or survey. You can also define a maximum size of the files. The data files will normally become very large. If you wish to record large amounts of EK80 data, make sure that you have enough space on your hard disk.
Page 229
Setting to work • Select to use the same recording range for all your active channels. Common • Select to allow the EK80 to automatically find the required range value. Auto • Select to use the different recording ranges for your active Individual channels.
Simrad EK80 Installation Manual Interfacing peripheral equipment Topics Installing navigation sensors and other sensors, page 228 Defining the serial and Ethernet (LAN) port parameters, page 230 Setting up the input from a navigation system (GPS), page 231 Configuring the sensor interface, page 234...
Page 231
Setting to work and the sensor is connected, you must define the datagram priority and finalize the configuration. Note Just making changes and selecting at the bottom of the page will not install anything. Select what to install, define the relevant parameters, and then select Procedure Open the menu.
Simrad EK80 Installation Manual Defining the serial and Ethernet (LAN) port parameters For any sensor interface to work, the communication parameters must be set up correctly. The EK80 software automatically scans the Processor Unit to locate and identify the available communication ports. Once the software has established a list of valid interfaces, you can set up and control the communication parameters.
Setting to work Select below the list to open the Setup Serial Port Setup LAN Port Setup dialog box. Set up the relevant serial or Ethernet (LAN) communication parameters. The communication parameters defined for NMEA 0183 are: • : 4800 bit/s Baud rate •...
Page 234
Simrad EK80 Installation Manual Context page allows your EK80 to communicate with external sensors Sensor Installation and systems. You must specify which communication port to use (LAN (Local Area Network) or serial port). You can type a custom name to identify the sensor import. In the list of valid datagram formats, select the format(s) to be accepted by the EK80.
Page 235
Setting to work If you want to check that the peripheral system is transmitting data to the EK80, select Monitor dialog box provides one text box for incoming messages ( Port Monitor ), and one for outgoing messages ( ). Use these boxes and your Data Tx Data knowledge of the data communication to investigate the datagrams.
Simrad EK80 Installation Manual Configuring the sensor interface With several sensors connected to the EK80, many of them will provide the same datagrams. We cannot expect that the datagrams provide the same information. page allows you to define a datagram priority, so that the Sensor Configuration information from the "most reliable"...
Setting to work Select the sensor you wish to configure in the list. Sensor If you wish to use the built-in datagram priority, select Auto • With enabled, the priority list is used. Information is imported from the Auto sensor at the top of the list. If the sensor fails to provide information for more than 20 seconds, data from the next sensor is used.
Page 238
Simrad EK80 Installation Manual Note Just making changes and selecting at the bottom of the page will not install anything. Select what to install, define the relevant parameters, and then select Procedure Connect the peripheral system providing the annotations to an available communication port on your Processor Unit.
Setting to work Select which datagram(s) you want to import from the peripheral device. When you select sensor type Annotation, only one datagram can be selected. 10 Do not specify a dedicated Talker ID. 11 Select to save the new device interface you have defined. The device interface is added to the list on the Installed Sensors...
Page 240
Simrad EK80 Installation Manual Note Just making changes and selecting at the bottom of the page will not install anything. Select what to install, define the relevant parameters, and then select Procedure Connect the peripheral catch monitoring system to an available communication port on your Processor Unit.
Setting to work 10 Select which datagram(s) you want to import from the peripheral device. When you select sensor type PI50, only one datagram can be selected; PI50 Datagrams. This is a group of datagrams that allows the EK80 to import information from catch monitoring systems.
Page 242
Simrad EK80 Installation Manual Note Just making changes and selecting at the bottom of the page will not install anything. Select what to install, define the relevant parameters, and then select Procedure Connect the peripheral trawl system to an available communication port on your Processor Unit.
Setting to work 10 Select which datagram(s) you want to import from the peripheral device. When you select sensor type ITI-FS, only one datagram can be selected; ITI-FS Datagrams. This is a group of datagrams that allows the EK80 to import information from trawl systems.
Page 244
ADCP operations cannot take place without input from a motion reference unit (MRU). The input must be provided on the KM Binary datagram format. KM Binary is a proprietary datagram format created by Kongsberg Maritime for general use. This format has very high resolution on timing and sensor parameters.
Setting to work dialog box is a tool for debugging purposes. It is neither required nor Monitor intended for normal operation of the EK80. Type a custom name to identify the interface in other dialog boxes. 10 Select which datagram(s) you want to import from the sensor. 11 If relevant, specify a dedicated talker ID.
Page 246
Simrad EK80 Installation Manual • The interface port is set up with the correct communication parameters. • The EK80 system is turned on and operates normally. • The new sensor is physically connected to the EK80 using a serial or network cable.
Setting to work If you want to check the communication parameters, select Inspect Port Note You cannot make any changes here. To change the communication parameters, use the page. I/O Setup If you want to check that the peripheral system is transmitting data to the EK80, select Monitor dialog box provides one text box for incoming messages (...
Page 248
Simrad EK80 Installation Manual Context The EK80 can export the depth information on several datagram formats. You can export several depth formats simultaneously, as each of them is handled independently. Procedure Connect the peripheral system to an available communication port on your Processor Unit.
Setting to work Choose which channel to use as source for the depth information. "Best practice" is to use the lowest frequency. In this context, the phrase channel is used as a common term to identify the combination of transceiver, transducer and operating frequency.
Page 250
Simrad EK80 Installation Manual • The EK80 system is turned on and operates normally. Neither tools nor instruments are required. Context The information imported to the EK80 from various sensors can also be useful for other systems on board your vessel. The EK80 allows you to "re-export"...
Setting to work Select below the list to open the Setup Serial Port Setup LAN Port Setup dialog box. Set up the relevant communication parameters. Select to save your choices. Apply On the left side of the dialog box, select Output Relay Output On the...
Page 252
Simrad EK80 Installation Manual For "slave" operation, a remote system (for example K-Sync) must be available to provide trigger pulses. For "master" operation, a remote hydroacoustic system (sonar, echo sounder) is connected. This remote system must be set up in "slave" mode.
Page 253
Setting to work Local connection on the Processor Unit Connection on remote device Turn on the EK80, and set it to normal use. Open the menu. Setup On the menu, select Setup Installation Observe that the dialog box opens. This dialog box contains a number Installation of pages selected from the menu on the left side.
Simrad EK80 Installation Manual This delay parameter is used differently depending on the chosen synchronization mode. • Stand-alone setting is not applicable when synchronization is Synchronization Delay switched off. • Master In Master mode, the EK80 waits for the delay time after the external trigger signal has been sent to the slaves before transmitting the ping.
Page 255
The socket fits a Conxall 7-pin Mini-Con-X ® shielded plug. The connections are made on pins 2, 3 and 5. The plug can be ordered from the manufacturer or purchased from Kongsberg Maritime. Use part number 387563. • : Switchcraft Conxall Manufacturer •...
Simrad EK80 Installation Manual Turn on the EK80, and set it to normal use. Open the menu. Setup On the menu, select Setup Installation Observe that the dialog box opens. This dialog box contains a number Installation of pages selected from the menu on the left side.
Page 257
Setting to work Context All the steps in this procedure are done in the EK80 user interface. Procedure Open the menu. Setup On the menu, select Setup Installation On the left side of the dialog box, select Installation and then to open the page.
Simrad EK80 Installation Manual Test procedures Topics Functional test of the EK80 Wide band scientific echo sounder, page 257 Measuring noise in passive operating mode, page 259 Reading the transceiver hardware and software versions, page 261 Verifying the communication with the course gyro, page 263...
Every EK80 software release is uniquely identified. The dialog box identifies About the current EK80 software version. If you wish to find the latest software version for the EK80, check our website. • https://www.kongsberg.com/ek80 Open the menu. Setup Select to open the dialog box.
Page 260
Simrad EK80 Installation Manual Note Certain software upgrades for the EK80 also include an upgrade for the transceiver. To ensure maximum operational performance, you must upgrade all transceivers with the software/firmware provided with the EK80 installation files. Make sure that each transducer has been installed with all settings defined.
Setting to work Allow the data recording to run approximately five minutes. Stop raw data recording. Use a file manager, and verify that the recorded file(s) have been saved on the chosen disk. Verify that the playback is operational. 14 Select on the top bar.
Page 262
Simrad EK80 Installation Manual • The vessel is berthed or at sea. In order to do this test, the ship must be "silent". • The water must be as deep as possible. Recommended minimum depth is 100 metres. • There must be no other vessels in the vicinity.
Setting to work Select to open the page. Tooltip Select to enable the tooltip. Noise Select to save the selected setting and close the dialog box. For each channel: Place the cursor in the approximate centre of the echogram, and observe the tooltip information.
Page 264
Simrad EK80 Installation Manual Caution You must never set the EK80 to "ping" unless the transducer is submerged in water. The transducer may be damaged if it transmits in open air. • All the relevant transceivers have been set up, and they are operational with their respective transducers.
Setting to work Result Fill in the software and firmware versions for each Transceiver Unit. Serial number TX Firmware version RX Firmware version Software version Related topics Test procedures, page 256 Verifying the communication with the course gyro Without the input from a course gyro, the EK80 will not be able to present correct navigational information.
Page 266
Simrad EK80 Installation Manual The properties of each of the available communication ports are defined on the I/O Setup page. The page allows your EK80 to communicate with external Sensor Installation sensors and systems. To make sure that the information from the "most reliable" sensors are used by the EK80, use the page to define a datagram priorities.
Setting to work X Offset Y Offset Z Offset Requirements Results Heading data is provided and displayed. The relevant communication parameters are recorded. Date and signature: Related topics Test procedures, page 256 Verifying the communication with a navigation system (GPS) For the EK80 to use and offer correct navigational information, one or more external sensors must be connected.
Page 268
Simrad EK80 Installation Manual sensors and systems. To make sure that the information from the "most reliable" sensors are used by the EK80, use the page to define a datagram priorities. Sensor Configuration The communication parameters defined for NMEA 0183 are: •...
Setting to work X Offset Y Offset Z Offset Requirements Results Position data is provided. Speed data is provided. Distance data is provided. Heading data is provided. The relevant communication parameters are recorded. Date and signature: Related topics Test procedures, page 256 Verifying the communication with speed log Without the input from a speed log, the EK80 will not be able to present correct navigational information.
Page 270
Simrad EK80 Installation Manual The properties of each of the available communication ports are defined on the I/O Setup page. The page allows your EK80 to communicate with external Sensor Installation sensors and systems. To make sure that the information from the "most reliable" sensors are used by the EK80, use the page to define a datagram priorities.
Setting to work Results Requirements Speed data is provided and displayed. The relevant communication parameters are recorded. Date and signature: Related topics Test procedures, page 256 Verifying the communication with the motion reference unit (MRU) The information from a motion reference unit (MRU) (normally heave, roll and pitch information) is imported into the EK80 to increase the accuracy of the echo data.
Page 272
Simrad EK80 Installation Manual On the menu, select Setup Installation On the left side of the dialog box, select Installation Motion Reference Unit If you use the motion sensor in the Motor Control Unit on the hull unit, make sure that is selected.
Setting to work X Offset Y Offset Z Offset Rotation Around X Rotation Around Y Rotation Around Z Requirements Results Motion compensation is operational. The compensated values are shown. Date and signature: Related topics Test procedures, page 256 Verifying the communication with a synchronization system Whenever more than one hydroacoustic system is installed on a vessel, interference may occur.
Page 274
Simrad EK80 Installation Manual • One of the acoustic systems is set up as "master", and controls the transmissions on the other systems. Procedure Test the synchronization when EK80 operates in Master mode. On the menu, select Setup Installation Select Synchronization Record the communication parameters in the result table.
Setting to work Making a noise/speed curve to determine vessel noise The performance of the EK80 will always be limited by different noise sources. During the Installation Manual, accurate noise measurements are done for different vessel speeds. The weather and sea conditions for the noise measurements will be those at the time of the test.
Page 276
Simrad EK80 Installation Manual Select to save the selected setting and close the dialog box. Establish a separate communication line with the bridge to verify the vessel speed during the test. Measure the acoustic noise versus the vessel speed. Start raw data recording.
Page 277
Setting to work Save the data using a unique file name that identifies context, date, time and vessel. Attach the data file to the electronic copy of the test report. Result Speed/Noise Speed Average Channel: Sea state: Use this table to record the values. Alternatively, you can type the values straight into a spreadsheet. Make the necessary copies so that you have one table for each channel.
Simrad EK80 Installation Manual Speed/Flow noise Speed Channel: Sea state: Use this table to record the values. Alternatively, you can type the values straight into a spreadsheet. Make the necessary copies so that you have one table for each channel.
Page 279
Setting to work If the Processor Unit does not turn itself off automatically, use the functionality provided by the operating system to turn it off manually. Turn off the display. If required, refer to the instructions provided by the display manufacturer. Turn off each transceiver.
Simrad EK80 Installation Manual Installation remarks Use this page to write down comments and remarks related to the EK80 installation. When the installation has been fully completed, and all functional tests have been made to full satisfaction, representatives from each party must sign.
(WBT) units are provided. For technical specifications about other transceivers supported by the EK80, see the relevant publications. Note At Kongsberg Maritime, we are continuously working to improve the quality and performance of our products. The technical specifications may be changed without prior notice.
LAN (Ethernet) communication port. The EK80 supports the following datagram format for annotations. • ATS Annotation ATS Annotation is a proprietary datagram format created by Kongsberg Maritime. It allows you to import text annotations from external devices. 394149/D...
Simrad EK80 Installation Manual Related topics Interface specifications, page 281 Technical specifications, page 279 Supported datagram formats for distance information In this maritime context, distance refers to the physical travelled distance the vessel has made since the sensor was last reset. A suitable external sensor must be provided. A global positioning system (GPS) with a compatible output format can also be used.
Technical specifications Supported datagram formats for external depth input The EK80 can receive depth information from en external echo sounder. The EK80 supports the following datagram format for depth information from an echo sounder: • NMEA DPT The NMEA DPT datagram provides the water depth relative to the transducer, and the offset of the measuring transducer.
Simrad EK80 Installation Manual • NMEA ZDA The NMEA ZDA datagram contains the universal time code (UTC), day, month, year and local time zone. Related topics Interface specifications, page 281 Technical specifications, page 279 Supported datagram formats for heading and gyro information The heading sensor provides the EK80 with the vessel’s current heading.
The EK80 supports the following datagram formats from a motion sensor. • KM Binary KM Binary is a generic datagram format defined by Kongsberg Maritime. This format has very high resolution on timing and sensor parameters. 394149/D...
Simrad EK80 Installation Manual • Kongsberg EM Attitude 3000 The Kongsberg EM Attitude 3000 is a proprietary datagram format created by Kongsberg Maritime for use with digital motion sensors. It holds roll, pitch, heave and heading information. • Furuno GPhve Furuno GPhve is a proprietary datagram format created by Furuno (http://www.furuno.jp) to contain heave information.
• Simrad PSIMP D Simrad PSIMP D is a proprietary datagram format created by Kongsberg Maritime to provide the type and configuration of PS and PI sensors used by a Simrad catch monitoring system. This datagram format is obsolete, and it is no longer in use on new designs.
Simrad EK80 Installation Manual Supported datagram formats for speed log information An external speed sensor is typically a global positioning system (GPS) or a dedicated speed log. When enabled, the vessel’s current speed is shown on the top bar. The EK80 supports the following datagram formats for speed information.
Technical specifications Supported datagram formats for water level offset information Many factors can cause the ship's draft to change. The amount of fuel, cargo or ballast may greatly influence the draft. Varying water temperatures and salinity will also have an effect. Draft changes will make any sensor move vertically on the X-axis when referenced to the sea surface.
• CP1 Current Profile The CP1 Current Profile datagram is a proprietary format created by Kongsberg Maritime. The datagram exports the velocity of the water current from the seafloor and from a selection of depth layers in the water column.
Page 293
• The BOT file format is a proprietary file format designed by Kongsberg Maritime to contain configuration and depth information. The BOT data file contains a set of datagrams. The datagram sequence is not fixed. It depends on the number of installed frequency channels.
: 500 W @ 230 VAC (Approximately) Power consumption The technical specifications are those valid for the computer that provided by Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased computer, refer to the documentation provided with the unit.
The technical specifications are those valid for the Ethernet switch that was delivered from Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased Ethernet switch, refer to the documentation provided with the unit.
Simrad EK80 Installation Manual For additional details, refer to the technical specifications provided by the manufacturer. Note This information was copied from the manufacturer’s documentation. To ensure that your information is correct, always consult the manufacturer’s own documents. Related topics...
: 16 kg (Approximately) Weight The technical specifications are those valid for the computer that provided by Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased computer, refer to the documentation provided with the unit.
The technical specifications are those valid for the Ethernet switch that was delivered from Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased Ethernet switch, refer to the documentation provided with the unit.
– IEC 60945 – IACS E10 The technical specifications are those valid for the computer that provided by Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased computer, refer to the documentation provided with the unit.
The technical specifications are those valid for the Ethernet switch that was delivered from Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased Ethernet switch, refer to the documentation provided with the unit.
: 140 cm Other compass The technical specifications are those valid for the computer that provided by Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased computer, refer to the documentation provided with the unit.
The technical specifications are those valid for the Ethernet switch that was delivered from Kongsberg Maritime as a part of the EK80 delivery. For specifications related to a locally purchased Ethernet switch, refer to the documentation provided with the unit.
Technical specifications, page 279 Minimum computer requirements Unless specifically ordered from Kongsberg Maritime, the EK80 is not provided with a computer. This item must be purchased locally. If you purchase a computer locally, make sure that the chosen model meets the functional and technical requirements.
Simrad EK80 Installation Manual • Serial interfaces The number of serial lines depends on the interface requirements. If you have connected a USB-to-serial adapter to the Processor Unit, do not remove it while the EK80 is running. Do not move the adapter to a different USB socket on the Processor Unit.
Page 307
Technical specifications • Resolution – : 1280 x 1024 pixels Minimum – : 1920 x 1200 pixels (or better) Recommended • : The video interface must match the output format(s) provided by Video interface the Processor Unit. The Processor Unit may offer video output on several formats. Investigate your options before you purchase a display.
The shipowner and shipyard doing the installation are responsible for obtaining and paying for such approval. Related topics Drawing file, page 306 Simrad EK80, page 13 Installing the EK80 hardware units, page 64 Technical specifications, page 279 394149/D...
Simrad EK80 Installation Manual 388697 Wide Band Transceiver (WBT) outline dimensions Download the source drawing from the EK80 pages on https://www.kongsberg.com/sim- rad. 394149/D...
Simrad EK80 Installation Manual 385609 Processor Unit dimensions Download the source drawing from the EK80 pages on https://www.kongsberg.com/sim- rad. 394149/D...
The phrase box is used to describe all kinds of cases, wooden or cardboard boxes etc used to hold the unit. Topics Transporting Kongsberg Maritime equipment, page 321 Lifting units and transportation boxes, page 322 Inspection of units and transportation boxes after arrival, page 323...
In the absence of other information, no other boxes must be stacked on top of it. Handle all boxes and units with care. Note Due to the nature of Kongsberg Maritime’s products, and the extensive use of delicate electronic parts, all units and boxes must be regarded and handled as fragile equipment.
Simrad EK80 Installation Manual Lifting units and transportation boxes Some of the boxes used to hold equipment units may be heavy. Use caution when lifting. Prerequisites Units and boxes may be heavy. Make sure that you have the necessary equipment required for lifting heavy items.
Equipment handling Note Due to the nature of Kongsberg Maritime’s products, and the extensive use of delicate electronic parts, all units and boxes must be regarded and handled as fragile equipment. Inspection of units and transportation boxes after arrival A visual inspection must be done immediately after the box(es) have arrived at their destination.
Simrad EK80 Installation Manual Specifications for storage prior to installation or use When a system, a unit or a spare part has been delivered to the customer, it may be subject to long time storage prior to installation and use.
Equipment handling Caution Units containing lithium or alkaline batteries must be handled separately and with care. Such units are marked accordingly. Do not attempt to recharge such batteries, open them, or dispose of them by incineration. Refer to the applicable product data sheets or battery handling procedures for further details.
Describe the damage, and collect photographic evidence if possible. Return the inspection report to Kongsberg Maritime as soon as possible. Place the box on a stable work bench or on the floor with the top of the box facing upwards.
Equipment handling Once the carton is open, carefully remove all loose packing and insulation material. Check for user manuals and other documents that may have been added to the carton during packing. Check also for special tools, door keys etc. Unpacking mechanical units Prior to installation or use, mechanical units must be unpacked from their transport boxes.
Describe the damage, and collect photographic evidence if possible. Return the inspection report to Kongsberg Maritime as soon as possible. Assuming all is well, open the bag and remove the unit. Take out and keep the documentation.
Equipment handling Unpacking transducers Prior to installation or use, transducers, sonar heads and hydrophones must be unpacked from their transport boxes. It is important that this unpacking is done without inflicting damage to the equipment. Prerequisites Observe the procedure for unpacking of standard parts and units. Context Transducers may be supplied mounted to a hull unit (if any), or packed separately.
Do not break the seal to open a circuit board package before the board is to be used. If the board package is returned to Kongsberg Maritime with the seal broken, we will assumed that the unit has been used, and then you will be billed accordingly.
Page 333
Equipment handling Note Unless otherwise specified, transducers and hydrophones must not be stored in temperatures below −10°C and above +50°C. 394149/D...
Page 337
Index synchronization using Clear To Send (CTS) ZDA (day, month, year and local time zone) ..283 and Request To Send (RTS) signals ....129 ZMQ (Beam velocity)......... 289 CTS (Clear to Send) datagram formats used in synchronization ....... 143 annotation data .........
Page 338
Simrad EK80 Installation Manual datagram format........289 Ethernet cable RJ45 ........147 dimensional survey Moxa CP114EL-I serial adapter ....114, 145 accuracy ..........181 Øverland UPC-3005 Serial line splitter..... 121 accuracy requirements for compass ....181 Øverland UPC-5000P Serial line splitter ... 125 accuracy requirements for course gyro .....
Page 339
Index unpacking a hydrophone ......329 unpacking a mechanical unit ......327 general requirements unpacking a sonar head ....... 329 supply power ..........37 unpacking a transducer........ 329 general safety rules ......... 36 unpacking an electronic or electromechanical unit ............. 328 datagram format........
Page 340
Simrad EK80 Installation Manual accuracy requirements for dimensional survey obtain and install the software license ....203 measurements ......... 181 prepare a cable for termination....... 171 interface requirements........33 secure and terminate a cable......173 optional item..........33 select measurement units ......225 recommended item ........
Page 341
Index annotations..........235 dry docking ..........39 important environmental .......... 298 before you power up........14 humidity..........298 if something breaks down ......14 noise sources ..........38 power off ..........14 temperature ..........298 reminders..........14 uninterruptible power supply......37 switch off ..........
Page 342
Simrad EK80 Installation Manual Wide Band Transceiver (WBT) ......21 purpose ............ 11 IP address target audience ........... 11 network adapter ........205 maritime authority IP Address approval of installation drawings ... 12, 46, 307 network adapter ........205 master setting up synchronization ......
Page 343
Index heading information ........284 accuracy requirements for dimensional survey NMEA DBS measurements ......... 181 datagram format........289 datagram formats ........285 NMEA DBT exporting motion data on a communication datagram format........289 port ............. 248 NMEA DDC interface requirements......30, 34 datagram format........
Page 344
Simrad EK80 Installation Manual when you are docking your vessel..... 14 connections ..........120 when you wish to switch off ......14 description ..........118 outline dimensions drawing ......121 technical specifications........ 119 Øverland UPC-5000P connections ..........124 description ..........122 turn............
Page 345
......107 prerequisites synchronisation using Auxiliary cable installation ......... 97 port ..........134, 252 presentation transporting Kongsberg Maritime adjusting the screen resolution ....... 212 equipment ..........321 problem turning off..........276 support if something breaks down..... 14 turning on ..........
Page 346
Simrad EK80 Installation Manual purpose ............ 20 defining the file and folder preferences for data required item ..........28 recording..........226 scope of supply........... 28 recording visual inspection ........192 defining the file and folder preferences for raw weight ........... 295 data recording.........
Page 347
Index radio frequency interference......168 uninterruptible power supply......35 speed log interface ........33 screen resolution steel conduit ..........105 adjusting ..........212 supply power ........37, 292 securing temperature ..........298 cable ............. 173 uninterruptible power supply...... 35, 37 security responsibility network............
Page 349
Index accuracy requirements for dimensional datagram format........286 survey measurements of global positioning temperature system..........181 requirements ..........298 accuracy requirements for dimensional survey temperature information measurements of heading sensor ....181 datagram formats ........288 accuracy requirements for dimensional survey termination measurements of motion reference unit ...
Page 350
Simrad EK80 Installation Manual brief description.......... 23 standard parts and units ....... 326 cavitation..........51 UPC-3005 installation summary ........83 connections ..........120 propellers..........51 description ..........118 required item ..........28 outline dimensions drawing ......121 scope of supply........... 28 technical specifications........
Page 351
Index introduction ..........21 wiring diagram outline dimensions....... 296, 308 bridge ............89 overview ..........21 computer ..........89 power requirements........293 topside ..........89, 93 power supply installation ....... 69 transceiver ........... 90–92 purpose ............ 21 Wide Band Transceiver (WBT) ....90–92 synchronisation using Auxiliary worker skills port ..........
Need help?
Do you have a question about the Simrad EK80 and is the answer not in the manual?
Questions and answers