Chapter 3 Commissioning
3.1 About this Chapter
3.2 Safety Instructions
3.3 Necessary Equipment and Documentation
3BSE029380R0101 Rev C
This chapter contains necessary information for commissioning your Web Tension System.
It is assumed that the Web Tension System has been installed according to the instructions given
in
Chapter 2 Installation
and
type.
You must know the following data before starting commissioning:
1.
Load cell type and nominal load, see Appendix for installed load cell type
2.
Object type, see
Section 3.12.2
–
Standard roll (two load cells)
–
Single side measurement (one load cell)
3.
Maximum web tension
4.
Desired output data at given web tension
5.
Communication data, see
Read and follow the safety instructions stated in
commissioning work. However, local statutory regulations, if stricter, are to take precedence.
The following items are required:
•
Cable diagram
•
Service tools
Tension Electronics PFEA111/112, User Manual
Appendix (B, C, D, E, F or G)
Section 3.13
Chapter 1
Section 3.1 About this Chapter
depending on installed load cell
Introduction, before starting any
3-1