Commissioning The Unit; Downloading The System Data - ABB HART FEP300 Commissioning Instruction

Electromagnetic flowmeter
Table of Contents

Advertisement

Startup Operation
4.3

Commissioning the unit

Important
For additional information about operation and menu navigation, refer to the operating
instruction for the device.
4.3.1

Downloading the system data

1. Switch on supply power. After switching on the supply power, the following messages are
displayed in the LCD display:
Fig. 36
2. Download the system data as follows:
For a completely new system or initial startup
Select "Transmitter" by pressing the ◄ key. This downloads the calibration data for the sensor
and the transmitter settings from the sensor memory, an integral memory module, to the
transmitter.
After replacing the complete transmitter or transmitter electronic unit
Select "Transmitter" by pressing the ◄ key. This downloads the calibration data for the sensor
and the transmitter settings from the sensor memory, an integral memory module, to the
transmitter.
After replacing the sensor
Select "Sensor" by pressing the ► key. This downloads the calibration data for the sensor and
the transmitter settings from the sensor memory, an integral memory module, to the transmitter.
The settings for the transmitter are stored in the SensorMemory. If the new sensor is a different
size, check the currently configured flow range.
3. The flowmeter is ready for operation and will operate with factory settings or settings
requested by the customer. To change the factory settings, refer to chapter "Parametrizing
via the "Easy Set-up" menu function ".
Important
System data must only be loaded during initial startup. If the supply power is later switched off,
the transmitter automatically loads the data once again the next time it is switched on.
A selection as described below (1-3) is not required.
30 - EN
ProcessMaster / HygienicMaster
CI/FEP300/FEH300-EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hart feh300

Table of Contents