Chapter 2 Installation; About This Chapter; Safety Instructions; Mounting The Load Cells - ABB PFEA 111 User Manual

Web tension systems with tension electronics
Table of Contents

Advertisement

Chapter 2 Installation

2.1 About this Chapter

2.2 Safety Instructions

2.3 Mounting the Load Cells

3BSE029380R0101 Rev C
The way you install your system has more influence on its functionality, accuracy and reliability
than you might think. The more accurate the installation, the better the measurement system. By
following the instructions in this chapter, you will fulfill the most important requirements for
proper mechanical and electrical installation.
The equipment is a precision instrument which, although intended for severe operating
conditions, must be handled with care.
Read and follow the safety instructions given in
work. However, local statutory regulations, if stricter, are to take precedence.
Installation requirements and mounting instructions are given in:
Appendix B PFCL 301E - Designing the Load Cell Installation
Appendix C PFTL 301E - Designing the Load Cell Installation
Appendix D PFRL 101 - Designing the Load Cell Installation
Appendix E PFTL 101 - Designing the Load Cell Installation
Appendix F PFCL 201 - Designing the Load Cell Installation
Appendix G PFTL 201 - Designing the Load Cell Installation
Tension Electronics PFEA111/112, User Manual
Section 2.1 About this Chapter
Chapter 1
, before starting any installation
2-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pfea 112

Table of Contents