Routing The Load Cell Cable - ABB PFEA 111 User Manual

Web tension systems with tension electronics
Table of Contents

Advertisement

E.7.1 Routing the Load Cell Cable
3BSE029380R0101 Rev C
c
 a
b
b
 a
Load cell PFTL 101  a
A/AE/AER
B/BE/BER
Figure E-3. Drilling Dowel Pin Holes
The cable must be supported with clamps and routed to prevent force shunting through the
cable.
Tension Electronics PFEA111/112, User Manual
Section E.7.1 Routing the Load Cell Cable
 a
 a
Tubular
b
c
dowel pin
8.4
8
15 15
12.5
20
12
15
c
NOTE
Do not drill in this
area, as internal
wiring may be
damaged.
E-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pfea 112

Table of Contents