E.7.1 Routing the Load Cell Cable
3BSE029380R0101 Rev C
c
a
b
b
a
Load cell PFTL 101 a
A/AE/AER
B/BE/BER
Figure E-3. Drilling Dowel Pin Holes
The cable must be supported with clamps and routed to prevent force shunting through the
cable.
Tension Electronics PFEA111/112, User Manual
Section E.7.1 Routing the Load Cell Cable
a
a
Tubular
b
c
dowel pin
8.4
8
15 15
12.5
20
12
15
c
NOTE
Do not drill in this
area, as internal
wiring may be
damaged.
E-9