Creating A New Project; Defining The Hardware - Siemens SIMADYN D Manual

System- and communication configuring
Hide thumbs Also See for SIMADYN D:
Table of Contents

Advertisement

1.2

Creating a new project

Step
1
Double-click on the symbol
(if the STEP 7 Assistant starts, cancel this.)
2
Select
File > New.
Enter "My First Project"
into the dialog box, Project.
In the dialog box, select the path
„LW:\Siemens\Step7\S7proj".
Click on OK.
3
Select
Insert > Station > SIMADYN D station.
1.3

Defining the hardware

Step
4
Select the hardware object
"SIMADYN D station" and select
Edit > Open object.
5
Open it, if required, the hardware catalog
with View > Catalog.
6
Select the SR6 from the
SIMADYN D family of modules and Catalog
Subracks and drag it to the (upper) window
7
Locate them one after the other
>CPU Modules >PM5 at slot 1
>Expansion Modules >IT41 at slot 2
>Slot covers >SR81 at slots 3 to 6
8
Open the properties dialog box of the PM5
CPU module with
Edit > Object properties.
9
Select the basic sampling time T0 (in this
case: 1 ms) under the basic clock cycle tab.
Click on the cyclic tasks tab and set the
sampling time T1 to 2 ms and T2 to 4 ms.
Click on OK.
System- and communication configuring D7-SYS - SIMADYN D
Edition 12.2001
Procedure
.
The SIMADYN D subrack structure is entered in STEP 7
(HW Config).
Procedure
In just a few steps to the first project
Result
The SIMATIC Manager is opened.
Your new project is displayed.
The "SIMADYN D station" hardware object
is inserted.
Result
HW Config is called-up.
The hardware catalog with all of the available
family of modules is opened.
The subrack is displayed with six slots.
The subrack is equipped.
The PM5 dialog box with general module
information and the setting registers for
addresses, basic clock cycle, cyclic tasks
and interrupt tasks are displayed.
The required sampling times are entered.
The properties dialog box is closed.
1-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D7-sys

Table of Contents