6.2.3 Type B physical orientation

(1) The flowmeter may be installed either
in a horizontal line or a vertical line.
(2) Where cleansing is required or where
air bubble entrapment is likely, we
suggest installation in a vertical run.
(3) If cable entry points upwards, take
necessary measures to prevent rain
and water from entering the meter.
(4) Transmitter installation is correct if its display face is not in the horizontal plane.
View from side
(5) For the orientation of separately mounted transmitter, see 6.9 Separately Mounted Transmitter
Installation.
Horizontal line
IN
View from bottom
Fig. 6.7
L -- 740 -- 28 -- E
Vertical line
OUT
OUT
IN
Fig. 6.6
View from top