Installing The Base Station Equipment - Nera WILINK I System Manual

Modular
Table of Contents

Advertisement

2.2

Installing the Base Station Equipment

2.2.1
BST Installation Requirements
2.2.1.1
Packing List
Base Station Chassis:
WILINK I-BST-SH Base Station Chassis
WILINK I-BST-AVU Air Ventilation Unit (installed)
Cables Tray kit
2.5 meter DC cable
WILINK I-BST-PIU (1 or 2 per chassis) Power Interface Unit(s)
2.5 meter DC cable (for a redundant PIU. One cable is supplied with each
chassis)
WILINK I-BST-PSU (up to 4 per chassis) Power Supply Unit(s)
WILINK I-BST-NPU Network Processing Unit and Monitor cable
WILINK I-BST-AU-IDU (up to 6 per chassis) Access Unit Indoor Unit(s)
2.2.1.2
Additional Installation Requirements
The following items are also required to install the BST:
Ethernet cable (straight) for connecting the NPU to a Hub/Switch.
NOTE
The maximum length of the Ethernet cable is 100m when operating at 100 Mbps and 70m when
operating at 1 Gbps.
A grounding cable with appropriate terminations for connecting the chassis to
the rack or another ground (earth) connection.
For installation in a 21" ETSI rack: Two 21" ETSI rack adapters
WILINK I MODULAR BASE STATION SYSTEM MANUAL
Installing the Base Station Equipment
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents