Nera WILINK I System Manual page 37

Modular
Table of Contents

Advertisement

2.1.2
Guidelines for Positioning the AU-ODU
This section provides key guidelines for selecting the optimal installation
locations for the AU-ODU and its antenna.
CAUTION
ONLY experienced installation professionals who are familiar with local building and safety codes
and, wherever applicable, are licensed by the appropriate government regulatory authorities should
install outdoor units and antennas.
Failure to do so may void the WILINK I product warranty and may expose the end user or Service
Provider to legal and financial liabilities. The Supplier and its resellers or distributors are not liable
for injury, damage or regulation violations associated with the installation of Outdoor Units or
antennas.
Select the optimal locations for the equipment using the following guidelines:
The ODU can be either pole or wall mounted. Its location should enable easy
access to the unit for installation and testing.
The higher the placement of the antenna, the better the achievable link
quality.
The antenna should be installed so as to provide coverage to all Subscriber
Units within its service area.
NOTE
The recommended minimum distance between any two antennas is 0.5 meters.
The ODU should be installed as close as possible to the antenna.
WILINK I MODULAR BASE STATION SYSTEM MANUAL
Installing the AU-ODU
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents