Figure 6-34 Removing the electronic lock
Step 3 Install the new electronic lock and connect the monitoring cable to the new lock.
Step 4 Log in to the ECC800 WebUI and choose System Settings > Access Right Management.
Set the access permission for the new electronic lock according to the access permission
setting for the faulty electronic lock. Then perform the Synchronize Permission operation.
Step 5 On the ECC800 WebUI, choose Monitoring > System > ECC800 > Controls > Delete
device with communication failure, and click Submit.
Step 6 Verify that the electronic lock is normal.
----End

6.4.5 Replacing a Smart ETH Gateway

Impact on the System
The facilities connected to the faulty ETH gateway cannot be monitored on the ECC800.
Preparations
Procedure
Step 1 Label each cable based on the corresponding ports on the smart ETH gateway.
Step 2 Disconnect cables from the smart ETH gateway.
Step 3 Remove the failure smart ETH gateway from the guide rails.
Issue 04 (2020-03-25)
Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, step ladder, labels, marker
Material: ETH gateway
Copyright © Huawei Technologies Co., Ltd.
6 Parts Replacement
71

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FusionModule5000 Smart Modular Data Center and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

V100r003c00

Table of Contents