Corrective Maintenance - CareFusion Alaris GP Technical & Service Manual

Volumetric pump
Hide thumbs Also See for Alaris GP:
Table of Contents

Advertisement

6

Corrective Maintenance

Ensure the pump is disconnected from the AC power supply and switched off before attempting to service .
A
V
The pump contains static-sensitive components and therefore strict ESD precautions should be observed at all
times .
Batteries should be disposed of as outlined by the local country regulations . Do not send batteries back to the
manufacturer .
Only use CareFusion recommended spare parts .
This chapter contains procedures required to properly disassemble, repair and replace parts and then to reassemble the pump.
Following all spare part replacement and repair activities, testing must be performed in accordance with the Performance Verification
Procedure (PVP), see Chapter 3, 'Preventative Maintenance' . Additional testing and calibration may be required after certain repairs are
completed, see table below for more information.
Performance Verification
Procedure
Battery Calibration
Volumetric Verification /
Calibration
Zero Point Calibration
Pressure Calibration
 = Required
Blank = Optional
          
 
 
 
1000SM00013 Iss. 4
Repair/Replacement of
 
48/80
Alaris® GP Volumetric Pump
Corrective Maintenance
  
  
  

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents