June 2003
Getting Started
Powering Up
2-2
The purpose of this section is to give a brief description of the Series
1 user program and explain how to use its front panel for viewing and
entering data. This section includes the following:
•
powering up the meter
•
entering data into the user program
•
screen and key functions
•
entering the passcode
•
getting on-line help
Read the following sections carefully to properly set up and operate
your instrument.
TO ENSURE THE SAFE OPERATION OF THIS UNIT,
YOU MUST INSTALL AND OPERATE THE SERIES 1
AS DESCRIBED IN THIS MANUAL. IN ADDITION, BE
SURE TO FOLLOW ALL APPLICABLE SAFETY
CODES AND REGULATIONS FOR INSTALLING
ELECTRICAL EQUIPMENT IN YOUR AREA.
The Series 1 has a universal power supply that automatically adjusts
to line voltages from 90 to 260 VAC. After making electrical
connections (including grounding) as described in Chapter 1,
Installation, of the Startup Guide, press the power switch to power up
the meter.
IMPORTANT: .The AC power cord is the main disconnect device.
For compliance with the EU's Low Voltage Directive
(IEC 1010), this unit requires an external power
disconnect device such as a switch or circuit breaker.
The disconnect device must be marked as such,
clearly visible, directly accessible, and located
within 1.8 m (6 ft) of the unit.
!WARNING!
Basic Programming