IMPORTANT: Monitor flow meter carefully during
test. Do not allow system flow to exceed 8 GPM (30
LPM).
10.Sit on seat, apply brakes fully and slowly depress the
traction pedal in the forward direction until 1000 PSI (69
bar) is displayed on the tester pressure gauge.
11. Internal leakage for the tested wheel motor will be
shown on flow meter in GPM. Flow should be less than
2 GPM (7.6 LPM) for the tested wheel motor.
Hydraulic System
12.If specifications are not met, the tested wheel motor
needs to be inspected and repaired as necessary (see
Wheel Motors and Wheel Motor Service in the Service
and Repairs section of this chapter).
13.If second wheel motor requires testing, perform test
procedure for the remaining motor.
14.When testing is complete, disconnect tester from
machine. Remove caps, plugs and/or fittings used dur-
ing testing. Connect hydraulic fittings and lines to rear
wheel motor(s).