Agitation Valve Assembly - Toro Multi Pro 5800 Service Manual

Hide thumbs Also See for Multi Pro 5800:
Table of Contents

Advertisement

Agitation Valve Assembly

FRONT
RIGHT
8
14
7
5
1. Agitation valve motor
2. Hosebarb
3. Flange
4. Adapter
5. Flynut (2 used)
6. Hosebarb
IMPORTANT: The agitation valve motor has a fuse
for circuit protection. Make sure that correct fuse is
installed in the in- -line fuse holder located in the
boom valve motor harness.
Spray System
1
15
4
16
12
18
14
Figure 20
7. Hosebarb
8. Mounting bracket
9. Balancing valve assembly
10. Fork
11. Fork (2 used)
12. Washer (4 used)
Page 6 - - 24
13
15
11
16
11
2
6
5
NOTE: ARROWS SHOW FLUID
FLOW DIRECTION
13. Cap screw (4 used)
14. Lock nut (4 used)
15. O- -ring (2 used)
16. O- -ring (2 used)
17. O- -ring
18. O- -ring (2 used)
The agitation switch on the operator spray console is
used to energize the agitation valve motor and open the
valve. The open agitation valve allows system flow to
reach the four (4) agitation nozzles located in the spray
tank.
3
13
10
12
9
18
Multi Pro 5800
17

Advertisement

Table of Contents
loading

Table of Contents