Remove The Air Baffle - HPE ProLiant ML30 Gen10 User Manual

Hide thumbs Also See for ProLiant ML30 Gen10:
Table of Contents

Advertisement

2. Install the front bezel.
3. Do one of the following:
If the server is in tower mode: Position the tower server for operation.
If the server is in rack mode: Install the server on the tray.
4. If removed, install the security padlock and/or Kensington security lock.
For more information, see the lock documentation.
5. Connect all peripheral cables to the server.
6. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
7. Power up the server.

Remove the air baffle

CAUTION: For proper cooling, do not operate the server without the access panel, baffles, expansion slot covers, or
blanks installed. If the server supports hot-plug components, minimize the amount of time the access panel is open.
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
28