Remove The Complete Access Panel; Remove The Air Baffle - HPE Apollo 4200 Gen10 Plus Maintenance And Service Manual

Table of Contents

Advertisement

Remove the complete access panel

Remove the complete access panel
CAUTION: Do not operate the server for long periods with the access panel open or removed. Operating the server in
CAUTION:
this manner results in improper airflow and improper cooling that can lead to thermal damage.
CAUTION: To prevent damage to electrical components, take the appropriate anti-static precautions before beginning
CAUTION:
any installation, removal, or replacement procedure. Improper grounding can cause electrostatic discharge.
Procedure
Procedure
1. Power down the server.
2. Remove the server from the rack .
3. Place the server on a flat, level surface.
4. Remove the access panel:
a. If necessary, unlock the access panel latch.
b. Press the release button.
c. Pull up the latch to disengage the access panel from the chassis.
d. Slide the access panel toward the rear of the server and lift it from the chassis.
Turn the access panel over to locate the HPE Apollo 4200 Gen10 Plus Server access panel label. This label provides convenient access
to component identification, LED status indicators, and system maintenance switch settings information.

Remove the air baffle

Remove the air baffle
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system components
WARNING:
to cool before touching them.
WARNING: This server is heavy. To reduce the risk of personal injury or damage to the equipment:
WARNING:
Observe local occupational health and safety requirements and guidelines for manual material handling.
Get help to lift and stabilize the product during installation or removal, especially when the product is not fastened
to the rails. Hewlett Packard Enterprise recommends that a minimum of two people are required for all rack server
installations. A third person may be required to help align the server if the server is installed higher than chest
level.
Use caution when installing the server in or removing the server from the rack; it is unstable when not fastened to
the rails.
CAUTION: To prevent damage to electrical components, take the appropriate anti-static precautions before beginning
CAUTION:
any installation, removal, or replacement procedure. Improper grounding can cause electrostatic discharge.
Procedure
Procedure
1. Power down the server.
2. Remove the server from the rack .
3. Place the server on a flat, level surface.
4. Remove the access panel .
HPE Apollo 4200 Gen10 Plus Server Maintenance and Service Guide
22

Advertisement

Table of Contents
loading

Table of Contents