HPE ProLiant ML30 Gen10 User Manual page 72

Hide thumbs Also See for ProLiant ML30 Gen10:
Table of Contents

Advertisement

10. Remove the mylar tape.
11. Install the M.2 SSD/dedicated iLO/serial port enablement board:
a. Insert the enablement board into the M.2 SSD slot at a 45° angle.
b. Carefully press the enablement board down to the horizontal position.
c. Install the enablement board screw.
12. Install the enablement board stabilizer.
72
Hardware options installation

Advertisement

Table of Contents
loading

Table of Contents