Installing An Sff Hot-Plug Drive - HPE ProLiant ML30 Gen10 User Manual

Hide thumbs Also See for ProLiant ML30 Gen10:
Table of Contents

Advertisement

4. Install the drive.
5. If the drive is installed in an empty drive cage after the initial system boot, reboot the system to maintain optimal
ventilation.
6. Determine the status of the drive from the drive LED definitions.
7. Install the front bezel.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise
website.

Installing an SFF hot-plug drive

CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
Procedure
1. Remove the front bezel.
2. Remove the drive blank.
3. Prepare the drive.
Hardware options installation
53

Advertisement

Table of Contents
loading

Table of Contents