HPE ProLiant ML30 Gen10 User Manual page 74

Hide thumbs Also See for ProLiant ML30 Gen10:
Table of Contents

Advertisement

The M.2 SSD/dedicated iLO/serial port enablement board is installed.
5 mm hex nut screwdriver is available.
Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
If the server is in tower mode: Position the tower server for hardware configuration.
If the server is in rack mode: Remove the server from the rack.
5.
Remove the front bezel.
6.
Remove the access panel.
7.
If installed, remove the air baffle.
8.
Remove the serial port blank.
9.
Install the serial port.
74
Hardware options installation

Advertisement

Table of Contents
loading

Table of Contents