HPE ProLiant ML30 Gen10 User Manual page 45

Hide thumbs Also See for ProLiant ML30 Gen10:
Table of Contents

Advertisement

d. Retract and hold the front retention bracket.
e. Insert the pegs on the mounting flange into the rack holes.
f. Release the front retention bracket.
g. Repeat steps a-f to fasten the other mounting rail.
h. Make sure that both rails are mounted at the same vertical position on both sides of the rack.
5. Slide the server tray into the rack.
The rails will click and lock into place when the tray is properly engaged.
45
Hardware options installation

Advertisement

Table of Contents
loading

Table of Contents