Long 1/4-28 Fitting With Flangeless Ferrule And Stainless Steel Lock Ring Installed On 1/8-Inch Od Tubing; Installing And Routing The Waste And Degasser Vent Tubing - Waters ACQUITY UPLC Overview And Maintenance Manual

Quaternary solvent manager
Table of Contents

Advertisement

Tighten the fitting finger-tight.
2.1.6 Long 1/4-28 fitting with flangeless ferrule and stainless steel
lock ring installed on 1/8-inch OD tubing
First use or re-installed
Compression screw
Lock ring
Ferrule
End of lock ring with larger inside diameter (ID)
Tighten the fitting finger-tight.
2.2 Installing and routing the waste and degasser vent
tubing
Notice:
powder-free gloves when performing this procedure.
Notice:
drain cup when attaching or removing the waste tubing.
Requirement:
this procedure.
To avoid contaminating system components, wear clean, chemical-resistant,
To avoid distorting the drip tray or causing the drain cup to leak, restrain the
Wear clean, chemical-resistant, powder-free gloves when performing
August 8, 2016, 715005050 Rev. C
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents