Waters ACQUITY UPLC Overview And Maintenance Manual page 32

Quaternary solvent manager
Table of Contents

Advertisement

Warning:
To avoid personal contamination with biohazards or compounds that are toxic, wear
clean, chemical-resistant, powder-free gloves when performing this procedure.
Requirement:
this procedure.
Required tools and materials
• Chemical-resistant, powder-free gloves
• Leak sensor
To install the leak sensor:
Notice:
disconnect an electrical assembly while electrical power is applied to a module.
To completely interrupt power, set the on/off switch to the "off" position, and then
disconnect the power cord from the ac source. Wait 10 seconds thereafter before
disconnecting an assembly.
1.
Power-off the solvent manager.
2.
Open the solvent manager's door.
3.
Unpack the new leak sensor.
4.
Align the leak sensor's T-bar with the slot in the side of the leak sensor reservoir, and slide
the leak sensor into place.
Figure 2–6: Aligning T-bar with slot
Wear clean, chemical-resistant, powder-free gloves when performing
To avoid damaging electrical components and circuitry, do not
August 8, 2016, 715005050 Rev. C
Page 32

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents