Waters ACQUITY UPLC Overview And Maintenance Manual page 50

Quaternary solvent manager
Table of Contents

Advertisement

Figure 3–5: Aligning T-bar with slot
T-bar
Slot in leak sensor reservoir
Leak sensor port on front of device
7.
Reinsert the vent tubing into the drip tray.
8.
Connect the leak sensor connector to the front of the device.
Figure 3–6: Attaching leak sensor connector
Leak sensor connector
Leak sensor port on front of device
9.
Power-on the solvent manager.
10. In the console, select the solvent manager, and then click Control > Reset module, to
reset the solvent manager.
August 8, 2016, 715005050 Rev. C
Page 50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents