Commissioning a control panel with integrated extinguishing

14
Troubleshooting
14 Commissioning a control panel with
70 | 178
Building Technologies
Fire Safety
integrated extinguishing
Prerequisites
The fire control panel is installed, but the batteries are not connected yet.
The cables for the extinguishing components, the ↑ detector lines, and the line
supply have been inserted in the integrated fire detector and extinguishing
control panel but are not connected yet.
Cerberus-Engineering-Tool is installed on the PC.
The current firmware and ↑ BDV are available on the PC.
You will find additional information about the individual steps on the specified
pages.
Commissioning steps
1. Create the ↑ pre-configuration for the extinguishing card and associated
extinguishing components. You will find more information in document
A6V10210424. See chapter 'Applicable documents'.
2. Prepare the integrated fire and extinguishing control panel for commissioning.
Link [➙ 71]
3. Connect the PC to the integrated fire and extinguishing control panel. Link
[➙ 27]
4. Load the configuration from the PC to the integrated fire and extinguishing
control panel. Link [➙ 30]
5. Calibrate the monitored outputs. Link [➙ 72]
6. Test the function of the 'Site'. Link [➙ 86]
7. Test the extinguishing function. You will find information about the
extinguishing test functions in document 'A6V10211076'.
8. Remedy any errors you notice and load the corrected configuration from the
PC to the integrated fire and extinguishing control panel. Link [➙ 30]
9. Disconnect the PC from the integrated fire and extinguishing control panel. Link
[➙ 27]
10. Perform the completion tasks. Link
See also
2 Preparing 'Station' for commissioning –without BDV
installation [➙ 75]
2 Connecting the PC to the station [➙ 27]
2 Loading configuration from the PC to the station [➙ 30]
2 Checking 'Site' function [➙ 86]
2 Disconnecting the PC from the station [➙ 27]
2 Preparing the control panel with integrated extinguishing for
commissioning [➙ 71]
2 Calibrating monitored outputs [➙ 72]
A6V10210416_j_en_--
2018-08-29