B1 - Commissioning Standalone 'Station' With Pc, Without Pre-Configuration - Siemens FS720 Commissioning, Maintenance, Troubleshooting

Fire detection system
Table of Contents

Advertisement

7 B1 - Commissioning standalone 'Station' with
Building Technologies
Fire Safety

B1 - Commissioning standalone 'Station' with PC, without pre-configuration

PC, without pre-configuration
First auto-configure the 'Station' in this commissioning variant. Then adapt the
↑ auto-configuration manually in Cerberus-Engineering-Tool.
The procedure in this chapter applies exclusively to ↑ standalone 'Stations' and is
only valid for C-NET detector lines.
Prerequisites
The ↑ detector lines and C-NET devices are installed.
The acceptance test has been carried out for the detector lines.
The ↑ 'Station' is installed, but the batteries are not connected yet.
The cables for the detector lines and the mains supply have been inserted in
the 'Station', but not yet connected.
Cerberus-Engineering-Tool is installed on the PC.
The current firmware and ↑ BDV are available on the PC.
You will find additional information about the individual steps on the specified
pages.
Commissioning
1. Prepare the 'Station' for commissioning. Link [➙ 74]
2. Perform auto-configuration:
Auto-configure 'Station'. Link [➙ 75]
OR
Auto-configure detector lines individually. Link [➙ 76]
3. Connect the PC to the 'Station'. Link [➙ 27]
4. Load the automatically created configuration to the PC. Link [➙ 77]
5. Adapt the configuration in Cerberus-Engineering-Tool. Link [➙ 77]
6. Load the configuration from the PC to the 'Station'. Link [➙ 30]
7. Test the function of the ↑ 'Site'. Link [➙ 86]
8. Remedy any errors you notice and load the corrected configuration from the
PC to the 'Station'. Link [➙ 30]
9. Disconnect the PC from the 'Station'. Link [➙ 27]
10. Perform the completion tasks. Link [➙ 86]
7
41 | 178
A6V10210416_j_en_--
2018-08-29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents