Locking The Casters; Removing A Shelf From Rails 49" Or Less Above The Floor - EMC Data Domain DS60 Hardware Manual

Expansion shelf installation and fru replacement
Table of Contents

Advertisement

Shelf Installation and Removal
EMC Data Domain DS60 Expansion Shelf Installation and FRU Replacement Hardware Guide
50
Figure 36 Locking the casters
CL5423
7. Pull the shelf onto the lift (, and then secure the shelf to the portable lift using
the securing straps as follows:
Figure 37 Removing a shelf from rails 49" or less above the floor
a. Place the strap around the lift and the shelf.
b. Insert the free end of the securing strap into the slot on the ratchet
mechanism. Pull the ratchet handle down to tighten the securing strap
around the lift and the shelf.
CL5432

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Data Domain DS60 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF