Shelf Installation and Removal
Lift
Required front
position
clearance
Side (long)
50"
Front
60"
(short)
Removing the front bezel
EMC Data Domain DS60 Expansion Shelf Installation and FRU Replacement Hardware Guide
36
Table 8 Planning your lift
Arm tray width
Greater than 18"
Between 16-17"
Figure 16 Best Practice: Using the portable lift adjacent to the long side of the shelf
NOTICE
You must remove the front bezel to gain access to the internal components. The bezel
is required for EMI compliance when the shelf is powered up. Remove it only to
replace or add an internal component.
Notes
Best practice, more stable
Requires arm adjustment, less stable
Refer to:
Adjusting the arms for a frontal lift
on page 27
CL5431
Need help?
Do you have a question about the Data Domain DS60 and is the answer not in the manual?
Questions and answers