2.2 Mechanical Installation
1. Attach the wire ropes for lifting to the support hooks on the top of the panel to lift the drive.
Figure 2.2
2. Ensure that the hanging angle is no greater than 60
1. Insert wire ropes for lifting through the support hook installation openings on the top of the drive.
Note: Drives are shipped with the support hook installation openings fitted.
Figure 2.3
38
Table 2.4 Transportation Procedure 1 (Class: 2 kV)
Transportation Procedure
Wire ropes for lifting
Top view
Drive
Figure 2.2 Inserting Wire Ropes for Lifting
Table 2.5 Transportation Procedure 2 (Class: 2 kV)
Transportation Procedure
Support hook
installation opening
Top view
Figure 2.3 Inserting Wire Ropes for Lifting
Front view
.
°
Wire ropes for lifting
Drive
Front view
YASKAWA ELECTRIC EZZ010928 FSDrive-MV1000 Instructions
Hanging angle of 60° max.