Maintenance; Maintenance; Part Replacement Guidelines - YASKAWA FSDrive-MV1000 Instructions Manual

Super energy-saving medium-voltage ac drive
Hide thumbs Also See for FSDrive-MV1000:
Table of Contents

Advertisement

6.3 Maintenance

6.3

Maintenance

In order to keep the drive operating reliably over a long period of time, we recommend replacing consumable parts.
To keep the drive operating normally over a long period of time, it is necessary to carry out periodical inspections and to
replace the consumable parts in accordance with their service lives. Periodic inspection standards vary, depending on the
drive installation environment and usage conditions. Carry out periodic maintenance by referring to
• For details on replacing batteries, see
• For details on replacing the cooling fan, see
• For details on replacing Power Cells, see
For the replacement of other parts, contact your Yaskawa representative or the nearest Yaskawa sales office. These
replacements must be undertaken by trained professionals.
• Cooling fan
• Contactor for cooling fan
• Power Cell smoothing capacitor
• Inrush prevention relay
• IGBT
• Fuses
• Aluminum capacitor on the printed circuit board
• Batteries (lithium batteries)
• Circuit breakers
• Other relays

◆ Part Replacement Guidelines

Table 6.3
shows the estimated performance life of components that require replacement during the life of the drive. Only
use Yaskawa replacement parts for the appropriate drive model and version.
Part Name
Cooling fan
Power Cell smoothing
capacitor
Fuses
Aluminum capacitor on the
printed circuit board
Battery (lithium battery)
Circuit breaker
NOTICE: The standard replacement period is based on the conditions listed below. The times stated are for guidance, and the lives of
the parts are not guaranteed for these times. Some parts may require more frequent replacement due to poor environments
or rigorous use.
Usage conditions for standard replacement period:
• Ambient temperature: Yearly average of 30
• Load factor: 80% maximum
166
Replacing the Battery on page
Replacing the Cooling Fan on page
Replacing Power Cells on page
Table 6.3 Standard Replacement Period
Standard Replacement
Period <1>
3 to 4 years
(40,000 service hours)
5 years
10 years
5 years
5 years
°
C
167.
172.
Replacement Method and Remarks
Replace with a new fan.
(Determine replacement need after inspection.)
Replace with a new capacitor.
(Determine replacement need after inspection.)
Replace with new fuses.
Replace with a new board.
(Determine replacement need after inspection.)
Replace with a new battery (connect the battery to the control board with
the connector).
Product name: CR6L-CN014S manufactured by FDK Corporation
Specifications: 3 V/2000 mAh
Determine replacement need after inspection.
YASKAWA ELECTRIC EZZ010928 FSDrive-MV1000 Instructions
Table
6.1.
169.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents