UPS System Installation
Figure 23
Installation Manual-Large and Large High Rate or the Eaton 93PM Universal Integrated Battery Cabinet
Installation Manual-Large and Large High Rate, listed in paragraph
cabinet wiring access information and instructions.
15. Connect the battery detect wiring to one pair of building alarm terminals. See paragraph
3.2.4 UPS System Interface Wiring Preparation
Figure 26
16. If wiring battery shunt trip connections, proceed to paragraph
4.7.3 Installing Battery Shunt Trip Interface
proceed to paragraph
proceed to paragraph
external parallel pull chain connections, proceed to paragraph
4.7.6 Installing External Parallel Pull Chain Control Wiring and
proceed to paragraph
to paragraph
17. Close the UPS outside door and secure the latch.
4 4 . . 7 7 . . 3 3 I I n n s s t t a a l l l l i i n n g g B B a a t t t t e e r r y y S S h h u u n n t t T T r r i i p p I I n n t t e e r r f f a a c c e e C C o o n n n n e e c c t t i i o o n n s s
NOTE 1
NOTE 2
To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions
2.
If not already opened, open the front door by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
3.
If not already removed, remove the screws securing the bottom internal safety shield panel and remove
the panel. Retain the hardware for later use.
4.
Remove the screws securing the internal safety shield panel above the bottom safety panel and remove
the panel to gain access to the battery shunt trip wiring terminals. Retain the hardware for later use.
5.
If wiring the battery shunt trip connections using the inter-cabinet wiring access pass-through (line-up-and-
match configurations), proceed to Step 6; if wiring the battery shunt trip connections using bottom entry
access, proceed to Step 8; if wiring the battery shunt trip connections using top entry access, proceed to
Step 10.
6.
Pass-through Wiring. Route the battery shunt trip wiring from the battery cabinet through the bottom
UPS inter-cabinet wiring access pass-through and static switch shelf bushing to the UPS battery shunt trip
terminals. See
locations. Refer to the Eaton 93PM Integrated Battery Cabinet Installation Manual-Large and Large High
Rate or the Eaton 93PM Universal Integrated Battery Cabinet Installation Manual-Large and Large High
Rate, listed in paragraph
instructions.
7.
Proceed to Step 11.
8.
Bottom Entry Wiring. Route the battery shunt trip wiring from the battery cabinet or battery disconnect
through the bottom of the UPS and static switch shelf bushing to the UPS battery shunt trip terminals. See
Figure 17
to the Eaton 93PM Integrated Battery Cabinet Installation Manual-Large and Large High Rate or the Eaton
70
Eaton 93PM UPS (400V/480V Four-Wire – 100 kW Frame) Installation and Operation Manual 164000566—Rev 04
for UPS interface terminal locations. Refer to the Eaton 93PM Integrated Battery Cabinet
for terminal assignments.
4.7.4 Generator Interface
4.7.5 Installing External Parallel CAN Control Wiring and
4.7.7 Installing Minislot Interface
4.8 Installing a REPO
Switch; otherwise, proceed to Step 17.
If installing interface wiring connections between standalone cabinets, conduit must be
installed between cabinets.
Disconnect terminal block plugs from terminal blocks to wire plugs.
Figure 19
for UPS wiring access information, and
1.8 For More
for UPS wiring access information, and
and
Table 24
for wiring and termination requirements, and
Connections; if wiring generator interface connections,
Connections; if wiring external parallel CAN connections,
Connections; if wiring Minislot connections,
Connections; if wiring REPO connections, proceed
for shutdown instructions.
Figure 28
Information, for battery cabinet wiring access information and
Figure 28
and
Figure 29
1.8 For More
Information, for battery
Connections; if wiring
and
Figure 29
for UPS terminal
for UPS terminal locations. Refer