Table 17. Power Cable Conduit Recommendations (400V) (Continued)
UPS
Rating
UPS Model
93PM-100-2
60 kW
93PM-100-3 (N+1)
93PM-100-2
70 kW
93PM-100-3 (N+1)
93PM-100-2
80 kW
93PM-100-3 (N+1)
93PM-100-2
90 kW
93PM-100-3 (N+1)
Eaton 93PM UPS (400V/480V Four-Wire – 100 kW Frame) Installation and Operation Manual 164000566—Rev 04
Terminal
Voltage
AC Input to UPS Rectifier
(A, B, C, Ground)
380 Vac
AC Input to UPS Bypass
400 Vac
(A, B, C, Neutral, Ground)
415 Vac
AC Output
(A, B, C, Neutral, Ground
Battery
DC
(Positive, Negative, Ground)
AC Input to UPS Rectifier
(A, B, C, Ground)
380 Vac
AC Input to UPS Bypass
400 Vac
(A, B, C, Neutral, Ground)
415 Vac
AC Output
(A, B, C, Neutral, Ground
Battery
DC
(Positive, Negative, Ground)
AC Input to UPS Rectifier
(A, B, C, Ground)
380 Vac
AC Input to UPS Bypass
400 Vac
(A, B, C, Neutral, Ground)
415 Vac
AC Output
(A, B, C, Neutral, Ground
Battery
DC
(Positive, Negative, Ground)
AC Input to UPS Rectifier
(A, B, C, Ground)
380 Vac
AC Input to UPS Bypass
400 Vac
(A, B, C, Neutral, Ground)
415 Vac
AC Output
(A, B, C, Neutral, Ground
Battery
DC
(Positive, Negative, Ground)
UPS Installation Plan and Unpacking
Minimum
Number of
Conduit Trade
Wires in
Size (Inches)
Conduit
1-1/2
4
5
2
5
2
1-1/2
3
4
2
5
2
5
2
1-1/2
3
4
2
5
2-1/2
5
2
1-1/2
3
4
2
5
2-1/2
5
2
3
1-1/2
Number
of
Conduits
1
1
1
2
1
1
1
2
1
1
1
2
1
1
1
2
41