Operation
Starting a Run
Filter Requirements
ZERO/Initialize
Operation
3-28
MIE ADR-1500 Instruction Manual
The following provides a brief overview of how to start a monitoring and
sampling run.
Before starting a run, a HEPA filter or optional 37-mm filter must be
inserted downstream of the optical assembly. The recommended 37-mm
filters are glass microfibre filters. If using the 5-micron PVC filters, use the
glass microfibre filters as a backing media when using battery power.
Equipment Damage At no time should the ADR-1500 be running without
a filter in place, otherwise serious damage to the internal components may
result.
▲
Before initiating a measurement run it is advisable to perform the zeroing
and automatic internal check out sequences, to ensure optimal operation.
From the Operate menu, press the
●
key to the Zero Instrument screen.
ZERO INSTRUMENT
FILTER READY
Attach a HEPA filter to the Total Inlet and press
through the cyclone.
During zeroing, each range within the auto-ranging potential is used to
measure the optical background of the instrument and each value is stored
for subsequent data calculations. The duration of a Zero Operation is
usually 2-3 minutes. After Zeroing is complete, the following screen should
be present:
ZERO INSTRUMENT
COMPLETE: BKG OK
From the Zero Instrument screen, by pressing the ▼ key, the user
●
proceeds to a series of logging screens in the following order:
key and scroll the ▲ or ▼
ENTER
. Do not zero
ENTER
Thermo Fisher Scientific