Assembly; Scope Of Delivery - ProMinent DULCOMETER D1Cb Series Instructions For Assembly And Use

Hide thumbs Also See for DULCOMETER D1Cb Series:
Table of Contents

Advertisement

Assembly

3 Assembly
NOTICE!
Installation position and conditions
Ensure that there is unimpeded access
for operation
Secure, low-vibration fixing
Avoid direct sunlight
Permissible ambient temperature at
fixing position: 0 ... 50°C at max. 95%
relative air humidity (non-condensing)
Reading and operating position
Install the device at a favourable posi‐
tion for reading and operating (pref‐
erably at eye level)
Installation position
Provide adequate clearance for the
cable
Allow at least 120 mm clearance above
the control in its "parked position"

3.1 Scope of Delivery

The following components are included as
standard with a DULCOMETER
D1Cb.
Description
Assembled device
20
®
control series
Number
1
Description
Half screw connection, complete
(set)
M12 x 1.5 screw connection,
complete (set)
Assembly material, complete, 3P
Universal (set)
Check kit (only with "inductive
conductivity" measured variable)
Measured variable labels D1C/
D2C
Operating manual
General safety instructions
CD-ROM with additional informa‐
tion and instructions
Number
1
1
1
1
1
1
1
1

Advertisement

Table of Contents
loading

Table of Contents