Switch Inputs Simulation; Factory Use Only - GE Power Quality Meter Series Instruction Manual

Table of Contents

Advertisement

4.6 S5 TESTING
]] SETPOINTS
]] S5 TESTING
MESSAGE
MESSAGE
] SWITCH INPUTS
] SIMULATION
4
MESSAGE
MESSAGE
] FACTORY
] USE ONLY
MESSAGE
MESSAGE
] END OF PAGE S5
]
Figure 4–38: SETPOINTS PAGE 5 – TESTING / SWITCH INPUTS SIMULATION
SIMULATION: Enter ON to switch from actual switch inputs to the programmed simulated switches. Set this
setpoint OFF after simulation is complete.
SIMULATION ENABLED FOR: Select the desired length of time that simulation will be enabled. When the
programmed time has elapsed, switch input simulation will turn off. If UNLIMITED is selected, the simulated
switch inputs will be used until simulation is turned off via the simulation on/off message or via the serial
port or until control power is removed from the PQM.
SWITCH INPUT A / B / C / D: Enter the switch input status (open or closed) to be simulated.
SERVICE PASSCODE: These messages are for access by GE Power Management personnel only for
testing and service.
4-58
SETPOINT
]] SETPOINTS
]] S1 PQM SETUP
MESSAGE
SIMULATION:
OFF
SIMULATION ENABLED
FOR: 15 min
SWITCH INPUT A:
OPEN
SWITCH INPUT B:
OPEN
SWITCH INPUT C:
OPEN
SWITCH INPUT D:
OPEN
MESSAGE
SERVICE PASSCODE:
0
PQM Power Quality Meter
4 PROGRAMMING

4.6.5 SWITCH INPUTS SIMULATION

Range: OFF, ON
Range: 5 to 300, UNLIMITED
Step: 5 min
Range: OPEN, CLOSED
Range: OPEN, CLOSED
Range: OPEN, CLOSED
Range: OPEN, CLOSED

4.6.6 FACTORY USE ONLY

GE Power Management

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqm seriesPqm-t20-c-a

Table of Contents