4.6 S5 TESTING

4.6 S5 TESTING
]] SETPOINTS
]] S5 TESTING
MESSAGE
MESSAGE
] TEST RELAYS & LEDS
]
OPERATION TEST: To verify correct operation of output relay wiring, each output relay and status indica-
tor can be manually forced on or off via the keypad or serial port.
While the OPERATION TEST setpoint is displayed, use the
4
desired output relay and/or status indicator to be tested. As long as the test message remains displayed
the respective output relay and/or status indicator will be forced to remain energized. As soon as a new
message is selected, the respective output relay and/or status indicator return to normal operation.
4-54
SETPOINT
MESSAGE
Figure 4–34: SETPOINTS PAGE 5 – TESTING
PQM Power Quality Meter
4.6.1 TEST OUTPUT RELAYS & LEDS
]] SETPOINTS
]] S1 PQM SETUP
OPERATION TEST:
NORMAL MODE
or
VALUE
VALUE
4 PROGRAMMING
keys to scroll to the
GE Power Management