A1 Metering; Current - GE Power Quality Meter Series Instruction Manual

Table of Contents

Advertisement

5.2 A1 METERING

5.2 A1 METERING
]] ACTUAL VALUES
]] A1 METERING
MESSAGE
MESSAGE

] CURRENT

]
5
A: B: C: CURRENT: Displays the current in each phase corresponding to the A, B, and C phase inputs. Cur-
rent will be measured correctly only if the CT PRIMARY is entered to match the installed CT primary and the CT
secondary is wired to match the 1 or 5 A input. If the displayed current does not match the actual current,
check this setpoint and wiring.
Iavg/Vavg: Displays the average of the three phase currents and three voltages is displayed in this message.
This line is not visible if the VT WIRING setpoint is set to SINGLE PHASE DIRECT. L-N is displayed when VT WIRING
is set to 4 WIRE WYE (3 VTs), 4 WIRE WYE DIRECT, 4 WIRE WYE (2 VTs), or 3 WIRE DIRECT. L-L is displayed when VT
WIRING is set to 3 WIRE DELTA (2 VTs).
5-2
ACTUAL
MESSAGE
A = 100
C = 100
Iavg=
Vavg=
Figure 5–2: ACTUAL VALUES – METERING / CURRENT
PQM Power Quality Meter
]] ACTUAL VALUES
]] A2 STATUS
B = 100
AMPS
100 AMPS
120 V L-N
NEUTRAL CURRENT =
0 AMPS
CURRENT UNBALANCE =
0.0%
Ia MIN =
100 AMPS
12:00:00am
01/01/95
Ib MIN =
100 AMPS
12:00:00am
01/01/95
Ic MIN =
100 AMPS
12:00:00am
01/01/95
In MIN =
100 AMPS
12:00:00am
01/01/95
I U/B MIN =
12:00:00am
Ia MAX =
100 AMPS
12:00:00am
Ib MAX =
12:00:00am
Ic MAX =
12:00:00am
In MAX =
12:00:00am
I U/B MAX =
12:00:00am
5 MONITORING
5.2.1 CURRENT
0.0%
01/01/95
01/01/95
100 AMPS
01/01/95
100 AMPS
01/01/95
100 AMPS
01/01/95
0.0%
01/01/95
GE Power Management

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqm seriesPqm-t20-c-a

Table of Contents