Table of Contents

Advertisement

5.2 A1 METERING
]] ACTUAL VALUES
]] A1 METERING
MESSAGE
MESSAGE

] DEMAND

]
5
PHASE A/B/C/NEUTRAL DEMAND: This message displays the phase A/B/C/N current demand (in Amps)
over the most recent time interval.
3Φ REAL POWER DEMAND: This message displays the 3 phase real power demand (in kW) over the most
recent time interval.
3Φ REACTIVE POWER DEMAND: This message displays the 3 phase reactive power demand (in kvar) over
the most recent time interval.
5-14
ACTUAL
MESSAGE
Figure 5–8: ACTUAL VALUES PAGE 1 – METERING / DEMAND
PQM Power Quality Meter
]] ACTUAL VALUES
]] A2 STATUS
PHASE A CURRENT
DEMAND = 125 A
PHASE B CURRENT
DEMAND = 125 A
PHASE C CURRENT
DEMAND = 125 A
NEUTRAL CURRENT
DEMAND = 25 A
3Φ Φ Φ Φ REAL POWER
DEMAND = 1000 kW
3Φ Φ Φ Φ REACTIVE POWER
DEMAND = 25 kvar
3Φ Φ Φ Φ REAL APPARENT
DEMAND = 1007 kVA
Ia MAX DMD = 560 A
12:00:00am
Ib MAX DMD = 560 A
12:00:00am
Ic MAX DMD = 560 A
12:00:00am
In MAX DMD = 560 A
12:00:00am
3Φ Φ Φ Φ kW MAX = 1000
12:00:00am
3Φ Φ Φ Φ kvar MAX = 25
12:00:00am
3Φ Φ Φ Φ kVA MAX = 1200
12:00:00am
5 MONITORING
5.2.6 DEMAND
01/01/95
01/01/95
01/01/95
01/01/95
01/01/95
01/01/95
01/01/95
GE Power Management

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pqm seriesPqm-t20-c-a

Table of Contents