Recommandation for process connection
1- Liquid
Place the transmitter below the process pipe
Make piping so that gas in the impulse pipe is not
delivered to the transmitter, and incorporate gas res-
ervoirs as required..
2-
Set two condensers at the same height between the
transmitter and the primary element.
Fill the pipe between the condensers and transmitter with
water.
Installation of a drain is necessary
3-
Place the transmitter above the process pipe. If the pro-
cess temperature is high, please use a condensate cham-
ber like for steam
4- Pressure measurement for liquid
The transmitter must be below the process pipe.
CAUTION
TN5FCXA2V5h-E
(1) During valves and manifold installation, please make sur that no dust
enter through the atmospheric air inlet.
(2) If pressure measurement is low (below 10kPa (1000mmH
lowing should be considered.
• Pressure variation due to wind around atmospheric air inlet
• Temperature variation near process connection
• Difference in atmospheric pressure between process connection and
transmitter location.
To overcome this, provide atmospheric pressure-side pipe with a
spheric air inlet in a box.
Differential pressure source (orifice)
Process pipe
isolating valve
Impulse pipe
Manifold
Isolating valve Process pipe
condensate
chamber
Impulse pipe
Manifold
Manifold
Impulse pipe
Isolating valve
Process pipe
Orifice plate
Pressure tap
Process pipe
Isolating valve
Impulse pipe
Atmospheric
air inlet
Manifold
O), the fol-
2
-
17