Intec Argus 3u plus Manual page 94

Table of Contents

Advertisement

11 Test Manager
If a test (or connection) is cancelled/cleared, the ARGUS will
return to the Test Manager if there is another test (or
connection) running in the background.
Some tests use so many resources that they cannot
be run in every combination with other tests. In this
case, the ARGUS will display the message "Test not
possible at this time".
Test/
Number of times that
Connection
this test/connection can
be started at the same
time
Incoming call
Outgoing call
BERT
LOOP
Service Tests
Suppl.serv.test
Time
measurement
X.31 Test
CF
Interrogation
Auto. Test
When the Auto. Test is
running
resources are in use and
no
connections are possible
BRI level
POTS voltage
96
The ARGUS will return to
the
Connection window.
2
2
2
2
1
1
1
1
1
1
all
of
the
other
tests
or
1
1
ARGUS 3u plus/3u NT
It is possible
to change to
another test
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No

Advertisement

Table of Contents
loading

This manual is also suitable for:

Argus 3u nt

Table of Contents