Simultaneously Starting Several Tests - Intec Argus 3u plus Manual

Table of Contents

Advertisement

11.1 Simultaneously Starting Several Tests

Starting a new test or connection during an existing
connection
ARGUS 3u plus/3u NT
11 Test Manager
Example:
There is a connection on B-
channel 1.
During this connection, the
Test Manager can be started
by pressing the
the <TM> softkey.
The ARGUS displays the
number
of
connections (-/01).
Use the <
> to select Start
new one.
The ARGUS returns to the
main menu.
Use the <
> to select
Single tests.
Use the
> to select the
<
desired test (e.g. bit error
rate test) .
Start test
(Still connected)
For
information
operation of bit error tests,
see Page 60
The ARGUS opens to the
Test Manager.
Use the
<
> to select
Outgo.connect.
The connection was started
first
(1/02),
there
connections / tests (1/02).
The
connection
channel 1 (B01).
-Key or
existing
on
the
are
2
uses
B-
95

Advertisement

Table of Contents
loading

This manual is also suitable for:

Argus 3u nt

Table of Contents