11 Test Manager
11 Test Manager
The ARGUS can simultaneously start fully independent BRI
or U-interface access tests or "connections".
As an example, a BERT can be run at the same time that
you make a phone call. The individual tests or "connections"
use resources.
All of the tests that have been started will be administered
by the Test Manager. Using the Test Manager you can start
new tests, switch between tests running in parallel or
terminate all of the tests that are currently running.
If the ARGUS is in the Connections or Single tests
menu (or in a test), the Test Manager can be
opened using the 6-Key or via the <TM> softkey.
94
In the Main menu, use the <
> to select the
↓
Test Manager.
Open the Test Manager
ARGUS 3u plus/3u NT