•
Line
Pin Assignment
3/4/5/6 BRI
7/8U-interface and POTS
Connection for BRI lines
(TE simulation or monitoring)
Connection for a BRI terminal (NT-Simulation)
Connection for a POTS (analog network)
Connection for the U-interface network
•
L-Test
- Connection for the optional test adapter for line tests
•
Headset
- Connection for the Headset
ARGUS 3u plus /3u NT
4 Operation
15