Siemens SINUMERIK Series Function Manual page 6

Safety integrated
Hide thumbs Also See for SINUMERIK Series:
Table of Contents

Advertisement

Table of contents
3.7.4
Safety Integrated overview - checksums...............................................................................60
3.8
Making the basic safety settings............................................................................................62
3.8.1
Calling the basic setting dialog...............................................................................................62
3.8.2
Options...................................................................................................................................64
3.8.3
Configuration..........................................................................................................................66
3.8.4
Encoder parameterization......................................................................................................67
3.8.5
Telegram configuration..........................................................................................................70
3.9
Safety Integrated functions....................................................................................................71
3.9.1
Calling function dialogs..........................................................................................................71
3.9.2
Safe Torque Off (STO)/Safe Stop 1 (SS1) - basis function....................................................72
3.9.3
Safe Torque Off (STO) - extended function...........................................................................73
3.9.4
Safe Brake Control (SBC)......................................................................................................75
3.9.5
Safe Stop 1 (SS1) Extended Function...................................................................................77
3.9.6
Safe Stop 2 (SS2)/Safe Operating Stop (SOS)......................................................................78
3.9.7
Safely Limited Speed (SLS)...................................................................................................80
3.9.8
Safe Speed Monitor (SSM)....................................................................................................81
3.9.9
Safe Acceleration Monitor (SAM)...........................................................................................83
3.9.10
Safe Direction (SDI)...............................................................................................................84
3.9.11
Safely Limited Position (SLP).................................................................................................85
3.9.12
Safe Brake Test (SBT)...........................................................................................................88
4
Commissioning - TM54F............................................................................................................................93
4.1
Introduction............................................................................................................................93
4.2
Activating the commissioning mode.......................................................................................95
4.3
Canceling the commissioning mode......................................................................................97
4.4
Exit the commissioning mode................................................................................................99
4.5
Configuring the TM54F........................................................................................................102
4.5.1
Calling the configuration range............................................................................................102
4.5.2
Configuration........................................................................................................................103
4.5.3
Inputs...................................................................................................................................105
4.5.4
Outputs.................................................................................................................................106
4.5.5
Drive groups.........................................................................................................................108
4.5.6
Working with parameter lists................................................................................................110
4.5.7
TM54F checksums...............................................................................................................111
5
Commissioning - acceptance tests...........................................................................................................113
5.1
Introduction..........................................................................................................................113
5.2
Content of the complete acceptance test.............................................................................115
5.3
Sequence of an acceptance test..........................................................................................119
5.3.1
Calling an acceptance test...................................................................................................119
5.3.2
Setting areas of the acceptance test....................................................................................120
5.3.3
Configuring and performing an acceptance test..................................................................126
6
Commissioning - application example......................................................................................................133
6.1
Planning...............................................................................................................................133
6.1.1
Creating a function table......................................................................................................133
6.1.2
From the function table to the logic diagram........................................................................134
6.2
Preconditions for commissioning.........................................................................................137
6
Function Manual, 10/2015, 6FC5397-3EP40-5BA3
Safety Integrated

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 828dSinamics s120

Table of Contents