Commissioning - acceptance tests
5.3 Sequence of an acceptance test
5. Press the "Finished" softkey.
The alarms that have been acquired are then listed in the detailed display.
Figure 5-8
In most cases, each alarm is listed twice in the "Collected alarms" field – more precisely
one alarm for each monitoring channel. All alarms marked with a checkmark are also
documented in the report.
6. Press the "Go to results" softkey.
After the acceptance test, the alarms that occurred are listed and a trace generated with
the relevant signals.
7. Define which of the listed alarms should be subsequently documented in the acceptance
report.
Remove the check mark (left) for all alarms that should not be documented in the report.
8. Enter the conditions to initiate the test.
An entry is mandatory here, in order to be able to start additional steps.
128
Acceptance test completed
Function Manual, 10/2015, 6FC5397-3EP40-5BA3
Safety Integrated