Starting The Quick Configuration Guide (Qcg) - SMA Sunny Island 2012 Technical Description

Stand-alone grid inverter
Table of Contents

Advertisement

(First) Commissioning

9.2 Starting the Quick Configuration Guide (QCG)

Information
The QCG sets up all parameters values automatically. Reasonable operation is possible
this way, with little manipulation.
The QCG is automatically activated when the device is started for the first time. Please continue
reading under point 7, otherwise follow this list.
1.
Insert the NH fuse in the BatFuse or close the
BatFuse's DC disconnector.
2.
Start the Sunny Island.
Press the DC start key on the Sunny Island
3.
The Sunny Island initiates the startup phase. Wait
for the following displays to finish.
4.
"To init system hold <Enter>" is displayed after
the startup phase.
5.
Press and hold the pushbutton on the Sunny
Control 1.
During this procedure a bar appears on the
display.
76
SI2012_2224-TEN082311
SMA Solar Technology AG
HSI2012BFSBOOT V1.002
SI2224
@SMA 2007
To init system
hold <Enter>
Technical Description