SMA Solar Technology AG
The configuration possibilities of the rotary code switch at a glance:
Parameter
0
1
2
7.8 Concluding Tasks
1.
Remove all tools from the enclosure.
2.
Have all cables been laid so as to be strain-relieved?
3.
Are there no communication cables inside the Sunny Island which are touching a stripped
230 V wire?
4.
Are all cable conduits on the Sunny Island sealed?
5.
Have all unused openings been closed with blind seals?
6.
Close the lower enclosure cover (see chapter 6.2 "Closing the Sunny Island" (Page 38)).
The installation of the Sunny Island and Sunny Remote Control 1 is complete.
Technical Description
Meaning
Master
Slave 1
Slave 2
SI2012_2224-TEN082311
Sunny Island Electrical Connection
69