Operating The Sunny Island; Switching On And Off; Switching On/Starting - SMA Sunny Island 2012 Technical Description

Stand-alone grid inverter
Table of Contents

Advertisement

SMA Solar Technology AG

10 Operating the Sunny Island

10.1 Switching On and Off

10.1.1 Switching On/Starting

WARNING!
Danger due to incorrect wiring of the island grid system
Only qualified electricians should carry out the first commissioning. Check the island grid
system beforehand for
correct electric cabling and connections
voltages and polarities
Start the island grid system with the Sunny Island
Information
The island grid system can also be operated without an external display (Sunny Remote
Control 1). In this case the Sunny Island works only with the default parameters (see
chapter 17.2 "Adjustable System Parameters" (Page 166)).
Proceed as follows:
1.
Insert the NH fuse in the BatFuse or close the BatFuse's DC disconnector.
2.
Press the DC start key on the Sunny Island
Wait approx. 20 to 30 seconds.
The Sunny Island is switched on
3.
Press and hold the start / stop button on the Sunny Island.
During the start procedure the inverter LED goes from orange to green.
4.
Let go of the start / stop button
The inverter LED glows green continually.
The Sunny Island is in operation.
Technical Description
Operating the Sunny Island
SI2012_2224-TEN082311
83

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 2224

Table of Contents