Closing The Sunny Island - SMA Sunny Island 2012 Technical Description

Stand-alone grid inverter
Table of Contents

Advertisement

Opening and Closing
Information
The cover screws can be loosened but not removed, which keeps them from getting lost.

6.2 Closing the Sunny Island

1.
Ensure that all cables are properly laid and that all tools have been removed from within the
Sunny Island's enclosure (see chapter 7 "Sunny Island Electrical Connection" (Page 39)).
2.
Plug the cable for the control area into the lower
enclosure cover.
3.
Starting from the front, place the cover evenly on
the housing.
4.
Screw all six screws in sequence and lightly into
their threads (one or two turns).
5.
Tighten the screws in a crosswise sequence and
with 2.5 Nm of torque.
38
SI2012_2224-TEN082311
SMA Solar Technology AG
Technical Description

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 2224

Table of Contents